Preconstruction Estimating in the US: Step-by-Step Guide to Pricing Construction Projects

Preconstruction Estimating in the US: Step-by-Step Guide to Pricing Construction Projects

A contractor who has ever struggled to win a bid knows how critical preconstruction estimating is. It’s right at the center of the entire preconstruction phase. 

But for a general contractor, it is also a marketing tool to show a client how transparent the project will be. Before schedules, permits, procurement, or subcontractor hiring, everything starts with the estimate. 

On the one hand, estimating tells the owner if the project is realistic. On the other hand, when the estimate is solid, the whole project feels organized from day 1. 

In my blog article, I will present a step-by-step preconstruction estimating process in the U.S. to break down complex projects into manageable, realistic numbers that you and your team can trust.

Table of Contents 

Free builders software for construction project management

Importance of Preconstruction Estimating 

The preconstruction phase is where projects gain their shape and direction. Beyond just numbers, it’s about understanding the full scope and identifying potential risks

A well-executed preconstruction process allows contractors to see if a project is feasible, align the budget with client expectations, and reduce costly surprises. 

For instance, I’ve had projects where early estimating revealed that the original flooring specification outlined by an architect was well above budget. Making some changes at this stage allowed me to recommend practical decisions to the client that highlighted my competitive advantages and saved the budget. It’s a clear example of why this phase isn’t just paperwork but prevention in real time.

Estimating Types 

In the US, the American Society of Professional Estimators (ASPE) identifies several types of construction estimates, each serving a specific stage of a project:

  • Order-of-Magnitude Estimate (ROM): A very early estimate used to determine project feasibility.
  • Schematic Design Estimate: An estimate based on the project’s initial schematic layout, offering a more informed cost outlook than the ROM stage.
  • Design Development Estimate: A refined estimate that uses the initial design to calculate more precise material and labor costs, considering potential changes.
  • Construction Document Estimate: A near-final estimate prepared once detailed construction drawings and specifications are complete, providing strong accuracy for budgeting and planning.
  • Bid Estimate: The final detailed estimate used to submit bids, including all costs for materials, labor, and subcontractors.

Who is Responsible for Preconstruction Estimating?

Preconstruction estimating isn’t always a one-person job. Who exactly leads it can vary depending on the size of the project or business and the roles and responsibilities within the construction team

At the center of the preconstruction estimate can be either a general contractor or a professional estimator. This work applies to a small construction project. 

For larger projects, preconstruction estimating becomes more structured. A dedicated estimator usually takes primary responsibility for preparing quantity takeoffs, calculating labor and material costs, and gathering bids from subcontractors. 

The estimator works closely with the project manager or construction manager, who ensure the estimate aligns with schedules and resources. 

Experienced estimators know where common challenges lie. In short, preconstruction estimating is a construction team effort, combining technical knowledge, practical field experience, and strategic insight. 

Step-by-Step Preconstruction Estimating 

Accurate preconstruction estimating is all about breaking a project into manageable steps. For most jobs, the workflow starts from reviewing documents, drawings, and blueprints, and is finished with the approval of the final budget by the client. 

Below is a detailed workflow based on preconstruction best practices and software-supported processes. 

Step #1: Review and Understand the Project 

Every solid estimate starts with one thing: fully understanding what the project is asking of you. And trust me, this step looks very different depending on the scope. This phase may require more time if you are a part of a large team pursuing a multi-million-dollar commercial job, unlike a small contractor who is bidding on whole home remodeling.

You may walk the site yourself, talk directly with the homeowner or developer, and ask practical questions like: is demolition included, or who’s handling the permits. 

In small projects, the general contractor usually is an estimator, and sometimes a project manager. For large projects, review becomes a more formal, methodical process. You typically deal with complete drawing sets, engineering reports, specs, and consultant notes. 

In these cases, the estimator leads the review but collaborates closely with project managers, superintendents, and trade partners to ensure nothing is missed.

👉Small job or large job, the purpose of this step remains the same: clarify the project before you price it.

Step #2: Break Down All Work Components Into Cost Codes

cost catalog items in Buildern

Once you’ve fully reviewed the project scope, the next critical step is organizing the costs to start bidding. Even a custom home has dozens of components, such as foundation, framing, mechanical systems, finishes, and landscaping. That’s before you consider the hundreds of line items of commercial contractors

Breaking all the work components into cost codes is a smart way to manage all pieces of the puzzle or of a construction project.  

A cost catalog is essentially a database of line items that includes labor, material, and equipment costs. It serves as a kind of template, allowing the estimator to pull existing pricing for work packages instead of calculating everything from scratch. 

Here’s how it typically works:

  1. Add a new cost code or import from another app,
  2. Link quantities to the corresponding cost codes.
  3. Pull unit costs from your cost catalog when doing an estimate for a project.

With construction management software, contractors can bundle materials, labor, and equipment into building assemblies, like mini-projects, where any change in quantity automatically updates all related calculations.

👉 Break the project into manageable pieces so nothing gets missed.

Step #3:Perform Quantity Takeoffs

Once the project is broken down into clear cost codes, the next step is performing quantity takeoffs. It measures exactly how much material, labor, and equipment the project will require.

If you or a subcontractor price a job based on assumptions, you already know how risky that can be. A small mistake will result in change orders, lost profit, or a budget.

Takeoff online tools in Buildern

For small construction projects, takeoffs often start with measurements from plans or on-site visits:

  • How many square feet of flooring?
  • How many fixtures are in each bathroom?

Estimators use detailed drawings, specifications, and 3D models to pull quantities with precision. Each measured item ties back to a cost code, and in many cases, to assemblies, so all associated materials and labor are calculated automatically.

👉 Measure everything before you say the price.

Step #4: Gather Subcontractor and Vendor Quotes

It’s now time to reach out to the people who will actually perform the work or supply the materials. In most projects, small or large, subcontractor and vendor pricing is one of the biggest parts of the final estimate.

For smaller jobs, this may look like calling your go-to roofer, plumber, electrician, or lumber supplier and sending them the scope and drawings.

On larger projects, this becomes a full bidding process. Multiple subcontractors submit proposals for the same work. When using construction management software, you need to compare the bids or do a bid leveling to choose the best quote.

bid leveling in buildern

Moreover, the approval process and negotiations can be conducted through software with in-built communication tools, such as messaging

In large commercial projects, the workflow may vary. Instead of putting simple quantities, the bid package for commercial builds is a larger document that includes project specifications, drawings, and a bill of materials.

Regardless of the project, the goal stays the same:

 👉 Get accurate, competitive pricing from trusted partners before finalizing your estimate.

Step #5: Ensure Markup Is Included 

The next step is to see if it’s time to make sure you are not just covering expenses, but actually running a profitable business. 

It starts with understanding markup, how much to apply, when to apply it, and whether clients should see it. In the U.S., typical contractor markup ranges from 10% to 30%, depending on the type of work, project size, and your company’s overhead.

construction builder markup

Should clients know about markup? This depends on your contract structure and your business model. Many contractors choose not to show markup directly and instead present a single lump-sum price. However, on some projects, transparency is expected.

From my experience, what clients want most isn’t to see your markup, it’s to feel confident that your estimate is fair, well-documented, and professionally prepared.

👉Costs keep the project moving, while markup keeps you profitable.

Step #6: Build the Final Estimate and Cost Summary

Once all information is collected, it comes together into one clear, organized estimate. The goal is to create a cost summary that’s easy for you to review and easy for the client to understand.

Construction estimating platforms make this step much more manageable by allowing you to group costs in multiple ways: by line item, by cost codes, or by cost types (labor, materials, equipment, subcontractors, etc.). These views help you cross-check accuracy and find inconsistencies.

estimate in buildern

A clean, structured cost summary is a kind of estimate that the construction workers can use and can be saved for future projects, too, or another ongoing project. 

👉A clear cost summary keeps your estimate reliable for this job and future projects.

Step #7: Make Estimate Versions and Convert Them Into a Proposal

Once your internal review is complete, the next step is turning the estimate into a proposal. This is where all the technical work from preconstruction becomes something a client can clearly understand and approve.

Contractors often generate several estimate versions before finalizing a proposal. Maintaining version control is critical. You might revise pricing, explore options, or prepare alternate packages for the client to compare․

estimate versioning in Buildern

One of the most useful practices at this stage is creating multiple versions of an estimate within a single project. You can generate as many versions as needed, lock finalized ones, and produce proposals from any version. 

This approach gives you the flexibility to test different scenarios, explore alternate materials or design options, and share choices with clients without losing track of prior numbers. 

👉 Keeping multiple estimate versions ensures you can test options.

Best Practices for Accurate Preconstruction Estimating in the US

Accurate preconstruction estimating doesn’t happen by chance. It’s the result of consistent practices and organized workflows. 

Over the years, I’ve seen how following some core best practices can save time and increase win rates. 

Let me show some practices I use. 

Always use up-to-date material and labor rates. Prices fluctuate constantly, and relying on outdated numbers can turn a winning bid into a loss. Regularly updating your cost catalogs and verifying vendor quotes is important.

Standardize cost codes and use them consistently across projects. Having a cost catalog is helpful for this particular, and all upcoming projects. 

Use subcontractor and vendor portals to collect competitive, up-to-date bids efficiently. It helps you make informed decisions and identify the best options without chasing emails or phone calls.

Break projects into assemblies rather than isolated items. Grouping work like a bathroom or a roofing system allows quantities and calculations to update automatically when changes occur.

Key Highlights

  • Preconstruction estimating sets the foundation for project feasibility, budgeting accuracy, and client trust.
  • A successful estimate begins with an in-depth scope review, ensuring all requirements, drawings, and site conditions are fully understood before pricing.
  • Breaking the project into cost codes keeps the estimate organized and prevents missed items or duplicated work.
  • Using construction management software for getting subcontractor and vendor quotes simplifies the process. Quotes must be updated regularly, as pricing changes frequently in the U.S. construction market.
  • A clear and structured final estimate helps contractors cross-check accuracy and present a clean, professional cost summary to clients.
  • Version control matters. Keeping multiple estimate versions allows flexibility, option pricing, and more transparent client proposals.
Free construction project management software online

What is Preconstruction Estimating?

Preconstruction estimating is the process of calculating labor, material, equipment, and subcontractor costs before a project begins. It’s important because it determines whether a project is feasible, helps prevent cost overruns, and helps win a project.

How to Do Estimation Step by Step?

Estimation follows a structured workflow that starts with gathering project documents and reviewing the size of the project. Contractors break the work into costs, send bid requests, compare them, and present a clear cost summary to the client.

How Accurate Are Preconstruction Estimates?

The accuracy of preconstruction estimates depends on many factors, including the skills of a general contractor or an estimator. Using up-to-date material and labor rates, standardized cost codes, and software-supported takeoffs can also reduce errors and make estimates more reliable. 

What Tools to Use for Preconstruction Estimating?

Many contractors rely on estimating or construction management software to perform digital takeoffs, update material prices automatically, compare subcontractor bids, and generate proposals.