{"id":6044,"date":"2026-10-14T04:15:45","date_gmt":"2026-10-14T11:15:45","guid":{"rendered":"https:\/\/buildern.com\/resources\/?p=6044"},"modified":"2026-10-22T12:43:53","modified_gmt":"2026-10-22T19:43:53","slug":"best-construction-crm-software","status":"publish","type":"post","link":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/","title":{"rendered":"Best Construction CRM Software in 2026"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The best construction CRM is the one that carries a lead all the way to a signed contract and a running job without retyping anything. For most small and mid-sized builders, that means a construction platform with CRM built in, not a generic sales tool.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The problem is that &#8220;construction CRM&#8221; covers very different products. Some are general sales CRMs with a construction template. Some are sales add-ons for roofing or service trades. Others are full construction management platforms where the CRM is the front door to estimating, scheduling and billing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide compares 10 tools that contractors actually shortlist in 2026, with pricing, best-for picks and the trade-offs of each. If you are still deciding whether you need a CRM at all, start with our guide on <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-crm\">what a construction CRM is and how it differs from a standard CRM<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How we evaluated these tools<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">We scored each tool on what a builder&#8217;s sales process needs, from first call to signed contract and handoff to the job.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Lead capture and pipeline.<\/strong> Web forms, lead sources, stages, follow-up reminders and win\/loss tracking.<\/li>\n\n\n\n<li><strong>Estimate-to-proposal flow.<\/strong> Can you build an estimate from a cost catalog and turn it into a branded proposal with e-signature?<\/li>\n\n\n\n<li><strong>Handoff to the job.<\/strong> Does a won lead become a project with its budget, schedule and documents, or do you start over in another tool?<\/li>\n\n\n\n<li><strong>Client experience.<\/strong> A client portal for selections, change orders, updates and payments.<\/li>\n\n\n\n<li><strong>Pricing transparency and fit.<\/strong> Published prices, per-user costs, and whether field staff, subs and clients cost extra.<\/li>\n\n\n\n<li><strong>Ease of setup.<\/strong> How long a small team needs to get running without a consultant.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Pricing below is taken from each vendor&#8217;s public pricing page or, where none exists, from reported quotes. It was checked in October 2026 and can change.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Best construction CRM software at a glance<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Buildern, JobTread and Buildertrend are the strongest picks for builders who want the CRM connected to estimating and project delivery; Followup CRM and JobNimbus suit sales-heavy commercial subs and exterior trades.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Tool<\/th><th>Best for<\/th><th>Type<\/th><th>Starting price (USD)<\/th><th>Client portal<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/buildern.com\/pricing\">Buildern<\/a><\/td><td>Custom home builders and GCs wanting CRM through to accounting<\/td><td>All-in-one construction platform<\/td><td>$225\/mo (2 seats); clients, subs and field users free<\/td><td>Yes, free<\/td><\/tr><tr><td><a href=\"https:\/\/www.jobtread.com\/pricing\">JobTread<\/a><\/td><td>Remodelers and small builders who want transparent per-user pricing<\/td><td>All-in-one construction platform<\/td><td>$199\/mo + $20\/user\/mo<\/td><td>Yes<\/td><\/tr><tr><td><a href=\"https:\/\/buildertrend.com\/pricing\/\">Buildertrend<\/a><\/td><td>Established residential builders with 5+ projects a year<\/td><td>All-in-one construction platform<\/td><td>Quote only; reported ~$339\u2013$499\/mo<\/td><td>Yes<\/td><\/tr><tr><td><a href=\"https:\/\/buildbook.co\/pricing\">BuildBook<\/a><\/td><td>Small residential teams that want simple setup<\/td><td>Lightweight construction PM + CRM<\/td><td>$79\/mo billed annually (1 user)<\/td><td>Yes<\/td><\/tr><tr><td><a href=\"https:\/\/www.houzz.com\/pro\">Houzz Pro<\/a><\/td><td>Remodelers and designers who want marketplace leads<\/td><td>Lead gen + business management<\/td><td>Reported from $99\/mo billed annually<\/td><td>Yes<\/td><\/tr><tr><td><a href=\"https:\/\/contractorforeman.com\/pricing\/\">Contractor Foreman<\/a><\/td><td>Budget-conscious small contractors<\/td><td>All-in-one construction platform<\/td><td>$49\/mo (1 user)<\/td><td>Yes<\/td><\/tr><tr><td><a href=\"https:\/\/www.followupcrm.com\/pricing\">Followup CRM<\/a><\/td><td>Commercial subcontractors with sales teams<\/td><td>Construction-specific sales CRM<\/td><td>$99\/user\/mo, 5-user minimum, annual<\/td><td>No<\/td><\/tr><tr><td><a href=\"https:\/\/www.jobnimbus.com\/pricing\">JobNimbus<\/a><\/td><td>Roofing and exterior contractors<\/td><td>Trade CRM + job management<\/td><td>Quote only<\/td><td>Limited<\/td><\/tr><tr><td><a href=\"https:\/\/www.hubspot.com\/pricing\/sales\">HubSpot<\/a><\/td><td>Marketing-led firms needing a general CRM<\/td><td>General CRM<\/td><td>Free; paid from ~$20\/seat\/mo<\/td><td>No<\/td><\/tr><tr><td><a href=\"https:\/\/www.pipedrive.com\/en\/pricing\">Pipedrive<\/a><\/td><td>Simple visual pipeline on a small budget<\/td><td>General CRM<\/td><td>$14\/seat\/mo (Lite, annual)<\/td><td>No<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>The 10 best construction CRM tools, reviewed<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. Buildern<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> custom home builders, remodelers and GCs who want one system from first lead to final invoice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/buildern.com\/features\/construction-crm-software\">Buildern<\/a> treats the CRM as the start of the job, not a separate app. A lead moves across a drag-and-drop pipeline, gets an estimate built from your cost catalog, becomes a branded proposal with e-signature, and turns into a project with the budget, schedule and documents already in place.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Key CRM features<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lead capture and tracking by project type, budget and location; imports from Excel, Google Sheets and Zapier<\/li>\n\n\n\n<li>Kanban sales pipeline from inquiry to signed contract<\/li>\n\n\n\n<li>Automated follow-ups, reminders and scheduled messages<\/li>\n\n\n\n<li>Estimates, proposals and contracts with integrated e-signatures<\/li>\n\n\n\n<li>Free client portal for schedules, selections, change orders, daily logs and messaging<\/li>\n\n\n\n<li>Dashboards for lead sources, conversion rates and sales trends<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> Starter $225\/mo (2 seats), Professional $360\/mo (4 seats), Enterprise custom; 10% off annual. Clients, subcontractors, vendors and field workers are free on every plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> lead, estimate, project and accounting data stay in one place; free external users keep costs predictable; QuickBooks and Xero integrations. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> more than a pure sales tool, so teams that only want a pipeline may not use everything they pay for.<\/p>\n\n\n\n<section class=\"wp-block-buildern-article-banner article-banner article-banner--general\"><div class=\"article-banner__general-layout\"><div class=\"article-banner__icons\"><img class=\"article-banner__icon\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/export.svg\" alt=\"\" aria-hidden=\"true\" loading=\"lazy\" decoding=\"async\"\/><img class=\"article-banner__icon\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/Group-155090.svg\" alt=\"\" aria-hidden=\"true\" loading=\"lazy\" decoding=\"async\"\/><\/div><div class=\"article-banner__content\"><img class=\"article-banner__logo\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/Buildern-Logo-Colored-100.svg\" alt=\"Buildern\" loading=\"lazy\" decoding=\"async\"\/><h3 class=\"article-banner__heading\">Construction Management Software<\/h3><p class=\"article-banner__description\">The all-in-one platform for managing construction projects from start to finish.<\/p><ul class=\"article-banner__checklist\"><li class=\"article-banner__checklist-item\"><span class=\"article-banner__check\" aria-hidden=\"true\"><\/span><span class=\"article-banner__checklist-label\">Project management<\/span><\/li><li class=\"article-banner__checklist-item\"><span class=\"article-banner__check\" aria-hidden=\"true\"><\/span><span class=\"article-banner__checklist-label\">Budget tracking<\/span><\/li><li class=\"article-banner__checklist-item\"><span class=\"article-banner__check\" aria-hidden=\"true\"><\/span><span class=\"article-banner__checklist-label\">Estimates &amp; proposals<\/span><\/li><li class=\"article-banner__checklist-item\"><span class=\"article-banner__check\" aria-hidden=\"true\"><\/span><span class=\"article-banner__checklist-label\">CRM &amp; Client communication<\/span><\/li><\/ul><a class=\"article-banner__button\" href=\"https:\/\/buildern.com\/schedule-demo\">Book a Free Demo<\/a><p class=\"article-banner__footnote\">No credit card required<\/p><\/div><\/div><\/section>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2. JobTread<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> remodelers and small residential builders who want all features at one transparent price.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">JobTread bundles a construction CRM with estimating, takeoff, e-signed contracts, bid requests and customer portals. Every plan includes every feature, so pricing scales only with internal users.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> $199\/mo base plus $20\/user\/mo (cheaper per user above 10 users); 20% off annual. No setup fees, 30-day money-back guarantee.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> clear pricing; unlimited jobs and portal users; strong estimating. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> the CRM is solid but simpler than dedicated sales CRMs; per-user costs add up for larger office teams.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3. Buildertrend<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> established residential builders running 5+ projects a year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Buildertrend&#8217;s sales tools cover lead management, email marketing drips, proposals and digital contracts, connected to a mature project management suite with selections and a homeowner portal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> quote only. Third-party reports put Essential at about $339\u2013$499\/mo and Complete at about $829\u2013$1,099\/mo. Unlimited users and projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> deep residential feature set; email drips built in; large user community. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> no public pricing; the CRM on lower tiers is light; heavier onboarding for small teams.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>4. BuildBook<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> small residential builders and remodelers who want something simple.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BuildBook combines CRM contacts, estimates, proposals with digital approvals, Gantt scheduling and a client dashboard in a clean, easy interface.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> Solo $79\/mo, Team $149\/mo (2\u20135 users), Business from $249\/mo, billed annually.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> fast setup; friendly client experience; affordable for one-person shops. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> lighter on pipeline automation, job costing and reporting than bigger platforms.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>5. Houzz Pro<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> remodelers and interior designers who want leads from the Houzz marketplace.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Houzz Pro routes homeowner inquiries from Houzz into a lead inbox, then handles follow-ups, consultations, proposals, invoices and a client dashboard.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> published only for entry tiers; reported from $99\/mo (Starter) to $399\/mo (Pro), billed annually.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> built-in lead source; 3D floor plans and mood boards. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> opaque pricing; key operations tools sit on higher tiers; reliance on Houzz leads.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>6. Contractor Foreman<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> small contractors on a tight budget.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Contractor Foreman includes lead management, estimates, bid management and a client portal on every plan, alongside a wide set of project management tools.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> Basic $49\/mo (1 user), Standard $105\/mo (3 users), Plus $166\/mo (8 users), Pro $221\/mo (15 users), Unlimited $332\/mo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> low entry price; lots of features per dollar; 30-day free trial. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> the interface feels busy; CRM and proposal tools are less polished.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>7. Followup CRM<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> commercial subcontractors (roofing, mechanical, electrical) with dedicated estimators and sales reps.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Followup CRM is a sales CRM built only for construction. It focuses on bid tracking, account management, sales automations and dashboards rather than running the job.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> Starter $99\/user\/mo and Professional $149\/user\/mo, both with a 5-user minimum billed annually, plus a one-time launch fee from $2,500.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> strong commercial bid and account tracking; deep reporting. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> expensive for small teams; no project management, so you still need a second system.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>8. JobNimbus<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> roofing, siding and other exterior contractors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">JobNimbus pairs a visual CRM board with estimates, e-sign, invoicing, financing and payments, plus supplier integrations common in roofing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> quote only; plans scale by users (Essentials up to 3, Pro up to 10, Premium up to 19, Enterprise 20+).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> built around the exterior-trade sales cycle; strong mobile app. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> less suited to custom homes or multi-phase builds; no public pricing.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>9. HubSpot<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> firms with an active marketing team that need email, forms and lead nurturing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HubSpot is a general CRM with a free tier, strong marketing automation and many integrations. It has no estimating, scheduling or job tools.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> free for up to 2 users; Sales Hub Starter from about $20\/seat\/mo; Professional about $100\/seat\/mo plus a $1,500 onboarding fee.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> free start; best-in-class marketing tools. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> needs customizing for construction; data must be re-entered or synced into your project software.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>10. Pipedrive<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best for:<\/strong> small teams that only need a simple visual sales pipeline.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pipedrive is an easy pipeline CRM with deal stages, activity reminders and email sync.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pricing:<\/strong> Lite $14, Growth $39, Premium $59, Ultimate $79 per seat\/mo (billed annually).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pros:<\/strong> very easy to use; low cost. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cons:<\/strong> nothing construction-specific: no estimates, proposals from a cost catalog, client portal or job handoff.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Which construction CRM fits your business?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Match the tool to how you win work and what happens after the contract is signed. For a feature-by-feature checklist, see <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-crm\">how to choose a construction CRM<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Your business<\/th><th>What matters most<\/th><th>Shortlist<\/th><\/tr><\/thead><tbody><tr><td>Custom home builder<\/td><td>Long sales cycles, detailed estimates, selections, cost-plus or fixed-price proposals, client portal<\/td><td>Buildern, Buildertrend<\/td><\/tr><tr><td>Remodeler<\/td><td>Fast estimates, quick proposals, many small jobs, homeowner communication<\/td><td>Buildern, JobTread, BuildBook, Houzz Pro<\/td><\/tr><tr><td>Small GC (1\u20135 office staff)<\/td><td>Low monthly cost, one tool instead of five, quick setup<\/td><td>Buildern, Contractor Foreman, BuildBook<\/td><\/tr><tr><td>Commercial subcontractor<\/td><td>Bid tracking across GCs, account management, sales team reporting<\/td><td>Followup CRM (+ a separate PM tool)<\/td><\/tr><tr><td>Roofing or exterior trade<\/td><td>Storm and insurance jobs, door-to-door sales, supplier ordering<\/td><td>JobNimbus<\/td><\/tr><tr><td>Marketing-led firm<\/td><td>Email nurturing, forms, ad attribution<\/td><td>HubSpot (+ a construction platform)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Three checks before you buy:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Count the real seats.<\/strong> Ask whether field workers, subs and clients need paid licenses. On per-user tools this can double the cost.<\/li>\n\n\n\n<li><strong>Test the handoff.<\/strong> In the trial, take one lead from first call to a signed proposal and a live project. Note every place you retype data.<\/li>\n\n\n\n<li><strong>Ask for the full price.<\/strong> For quote-only tools, request the total first-year cost including onboarding and launch fees.<\/li>\n<\/ol>\n\n\n\n<section class=\"wp-block-buildern-article-faq article-faq\" data-article-faq=\"\"><h2 class=\"article-faq__title\">FAQ<\/h2><div class=\"article-faq__items\">\n<details class=\"wp-block-buildern-article-faq-item article-faq__item\"><summary class=\"article-faq__question\"><h4 class=\"article-faq__question-title\"><strong>What is the best CRM for construction companies?<\/strong><\/h4><span class=\"article-faq__chevron\" aria-hidden=\"true\"><svg width=\"12\" height=\"8\" viewBox=\"0 0 12 8\" fill=\"none\" focusable=\"false\" aria-hidden=\"true\"><path d=\"M1 1.5L6 6.5L11 1.5\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span><\/summary><div class=\"article-faq__answer\">\n<p class=\"wp-block-paragraph\">For most small and mid-sized builders, an all-in-one platform with a built-in CRM, such as Buildern, JobTread or Buildertrend, works best because leads become projects without re-entry. Commercial subs with large sales teams often prefer a dedicated sales CRM like Followup CRM.<\/p>\n<\/div><\/details>\n\n\n\n<details class=\"wp-block-buildern-article-faq-item article-faq__item\"><summary class=\"article-faq__question\"><h4 class=\"article-faq__question-title\"><strong>Can I use HubSpot or Salesforce as a construction CRM?<\/strong><\/h4><span class=\"article-faq__chevron\" aria-hidden=\"true\"><svg width=\"12\" height=\"8\" viewBox=\"0 0 12 8\" fill=\"none\" focusable=\"false\" aria-hidden=\"true\"><path d=\"M1 1.5L6 6.5L11 1.5\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span><\/summary><div class=\"article-faq__answer\">\n<p class=\"wp-block-paragraph\">Yes, for lead tracking and marketing. But they have no estimating, proposals from a cost catalog, client portal or job handoff, so you will need to connect them to construction software.<\/p>\n<\/div><\/details>\n\n\n\n<details class=\"wp-block-buildern-article-faq-item article-faq__item\"><summary class=\"article-faq__question\"><h4 class=\"article-faq__question-title\"><strong>How much does construction CRM software cost?<\/strong><\/h4><span class=\"article-faq__chevron\" aria-hidden=\"true\"><svg width=\"12\" height=\"8\" viewBox=\"0 0 12 8\" fill=\"none\" focusable=\"false\" aria-hidden=\"true\"><path d=\"M1 1.5L6 6.5L11 1.5\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span><\/summary><div class=\"article-faq__answer\">\n<p class=\"wp-block-paragraph\">General CRMs start free or around $14\u2013$20 per user per month. Construction platforms with CRM included usually cost $50\u2013$400 per month for a small team, and quote-only tools can run $500\u2013$1,000+ per month.<\/p>\n<\/div><\/details>\n\n\n\n<details class=\"wp-block-buildern-article-faq-item article-faq__item\"><summary class=\"article-faq__question\"><h4 class=\"article-faq__question-title\"><strong>Is there a free construction CRM?<\/strong><\/h4><span class=\"article-faq__chevron\" aria-hidden=\"true\"><svg width=\"12\" height=\"8\" viewBox=\"0 0 12 8\" fill=\"none\" focusable=\"false\" aria-hidden=\"true\"><path d=\"M1 1.5L6 6.5L11 1.5\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span><\/summary><div class=\"article-faq__answer\">\n<p class=\"wp-block-paragraph\">HubSpot has a free tier for up to 2 users, but it is not construction-specific. Most construction platforms offer a free trial or demo instead of a free plan.<\/p>\n<\/div><\/details>\n\n\n\n<details class=\"wp-block-buildern-article-faq-item article-faq__item\"><summary class=\"article-faq__question\"><h4 class=\"article-faq__question-title\"><strong>Do I need a CRM if I already use construction management software?<\/strong><\/h4><span class=\"article-faq__chevron\" aria-hidden=\"true\"><svg width=\"12\" height=\"8\" viewBox=\"0 0 12 8\" fill=\"none\" focusable=\"false\" aria-hidden=\"true\"><path d=\"M1 1.5L6 6.5L11 1.5\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span><\/summary><div class=\"article-faq__answer\">\n<p class=\"wp-block-paragraph\">Check whether your platform already includes lead tracking, proposals and a sales pipeline. Many do, and a second CRM can create duplicate data.<\/p>\n<\/div><\/details>\n\n\n\n<details class=\"wp-block-buildern-article-faq-item article-faq__item\"><summary class=\"article-faq__question\"><h4 class=\"article-faq__question-title\"><strong>What features should a construction CRM have?<\/strong><\/h4><span class=\"article-faq__chevron\" aria-hidden=\"true\"><svg width=\"12\" height=\"8\" viewBox=\"0 0 12 8\" fill=\"none\" focusable=\"false\" aria-hidden=\"true\"><path d=\"M1 1.5L6 6.5L11 1.5\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span><\/summary><div class=\"article-faq__answer\">\n<p class=\"wp-block-paragraph\">Lead capture, a sales pipeline, follow-up automation, estimates and proposals with e-signature, a client portal and a clean handoff to the project. Our <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-crm\">construction CRM guide<\/a> covers each in detail.<\/p>\n<\/div><\/details>\n<\/div><\/section>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Final thoughts<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pick the CRM that removes the most retyping between your first call and your first invoice. If you sell and build residential projects, a construction platform with CRM built in will usually beat a general sales tool.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Buildern connects leads, estimates, proposals, the client portal, scheduling and accounting in one place, with clients, subs and field users free on every plan. <a href=\"https:\/\/buildern.com\/schedule-demo\">Book a demo<\/a> to see how a lead becomes a live project.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/buildern.com\/schedule-demo\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"297\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-1024x297.png\" alt=\"Free construction software online\" class=\"wp-image-752\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-1024x297.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-300x87.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-768x223.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software.png 1504w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The best construction CRM is the one that carries a lead all the way to a signed contract and a running job without retyping anything. For most small and mid-sized builders, that means a construction platform with CRM built in, not a generic sales tool. The problem is that &#8220;construction CRM&#8221; covers very different products. [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":6045,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[2,106],"tags":[179,105,38],"class_list":["post-6044","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-construction-software-reviews","tag-construction-client-management","tag-construction-crm","tag-construction-management-software"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>10 Best Construction CRM Software for Contractors (2026)<\/title>\n<meta name=\"description\" content=\"Compare the 10 best construction CRM tools for 2026 on pricing, lead tracking, proposals and client portals.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"10 Best Construction CRM Software for Contractors (2026)\" \/>\n<meta property=\"og:description\" content=\"Compare the 10 best construction CRM tools for 2026 on pricing, lead tracking, proposals and client portals.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/\" \/>\n<meta property=\"og:site_name\" content=\"Buildern resources\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/buildernsoft\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-14T11:15:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T19:43:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/construction-crm-software-tools.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1460\" \/>\n\t<meta property=\"og:image:height\" content=\"952\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Meri Markaryan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Meri Markaryan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/\"},\"author\":{\"name\":\"Meri Markaryan\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/person\\\/51b7b24ec569683e9d0308be4b5161a8\"},\"headline\":\"Best Construction CRM Software in 2026\",\"datePublished\":\"2026-10-14T11:15:45+00:00\",\"dateModified\":\"2026-10-22T19:43:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/\"},\"wordCount\":1935,\"publisher\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/construction-crm-software-tools.png\",\"keywords\":[\"Construction Client Management\",\"Construction CRM\",\"Construction Management Software\"],\"articleSection\":[\"Construction Blog\",\"Construction Software Reviews\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/\",\"name\":\"10 Best Construction CRM Software for Contractors (2026)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/construction-crm-software-tools.png\",\"datePublished\":\"2026-10-14T11:15:45+00:00\",\"dateModified\":\"2026-10-22T19:43:53+00:00\",\"description\":\"Compare the 10 best construction CRM tools for 2026 on pricing, lead tracking, proposals and client portals.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/#primaryimage\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/construction-crm-software-tools.png\",\"contentUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/construction-crm-software-tools.png\",\"width\":1460,\"height\":952,\"caption\":\"top 10 construction crm software\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/best-construction-crm-software\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Best Construction CRM Software in 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#website\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\",\"name\":\"Buildern resources\",\"description\":\"Buildern resources\",\"publisher\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/buildern.com\\\/resources\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\",\"name\":\"Buildern resources\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Buildern-logo..png\",\"contentUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Buildern-logo..png\",\"width\":401,\"height\":137,\"caption\":\"Buildern resources\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/buildernsoft\",\"https:\\\/\\\/www.instagram.com\\\/buildern.soft\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/buildern\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@buildern\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/person\\\/51b7b24ec569683e9d0308be4b5161a8\",\"name\":\"Meri Markaryan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"caption\":\"Meri Markaryan\"},\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/author\\\/meri-markaryan\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"10 Best Construction CRM Software for Contractors (2026)","description":"Compare the 10 best construction CRM tools for 2026 on pricing, lead tracking, proposals and client portals.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/","og_locale":"en_US","og_type":"article","og_title":"10 Best Construction CRM Software for Contractors (2026)","og_description":"Compare the 10 best construction CRM tools for 2026 on pricing, lead tracking, proposals and client portals.","og_url":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/","og_site_name":"Buildern resources","article_publisher":"https:\/\/www.facebook.com\/buildernsoft","article_published_time":"2026-10-14T11:15:45+00:00","article_modified_time":"2026-10-22T19:43:53+00:00","og_image":[{"width":1460,"height":952,"url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/construction-crm-software-tools.png","type":"image\/png"}],"author":"Meri Markaryan","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Meri Markaryan","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/#article","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/"},"author":{"name":"Meri Markaryan","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8"},"headline":"Best Construction CRM Software in 2026","datePublished":"2026-10-14T11:15:45+00:00","dateModified":"2026-10-22T19:43:53+00:00","mainEntityOfPage":{"@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/"},"wordCount":1935,"publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"image":{"@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/construction-crm-software-tools.png","keywords":["Construction Client Management","Construction CRM","Construction Management Software"],"articleSection":["Construction Blog","Construction Software Reviews"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/","url":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/","name":"10 Best Construction CRM Software for Contractors (2026)","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/#website"},"primaryImageOfPage":{"@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/#primaryimage"},"image":{"@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/construction-crm-software-tools.png","datePublished":"2026-10-14T11:15:45+00:00","dateModified":"2026-10-22T19:43:53+00:00","description":"Compare the 10 best construction CRM tools for 2026 on pricing, lead tracking, proposals and client portals.","breadcrumb":{"@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/#primaryimage","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/construction-crm-software-tools.png","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/construction-crm-software-tools.png","width":1460,"height":952,"caption":"top 10 construction crm software"},{"@type":"BreadcrumbList","@id":"https:\/\/buildern.com\/resources\/blog\/best-construction-crm-software\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/buildern.com\/resources\/"},{"@type":"ListItem","position":2,"name":"Best Construction CRM Software in 2026"}]},{"@type":"WebSite","@id":"https:\/\/buildern.com\/resources\/#website","url":"https:\/\/buildern.com\/resources\/","name":"Buildern resources","description":"Buildern resources","publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/buildern.com\/resources\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/buildern.com\/resources\/#organization","name":"Buildern resources","url":"https:\/\/buildern.com\/resources\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","width":401,"height":137,"caption":"Buildern resources"},"image":{"@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/buildernsoft","https:\/\/www.instagram.com\/buildern.soft\/","https:\/\/www.linkedin.com\/company\/buildern\/","https:\/\/www.youtube.com\/@buildern"]},{"@type":"Person","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8","name":"Meri Markaryan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","caption":"Meri Markaryan"},"url":"https:\/\/buildern.com\/resources\/author\/meri-markaryan\/"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2026\/10\/construction-crm-software-tools.png","post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/6044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/comments?post=6044"}],"version-history":[{"count":5,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/6044\/revisions"}],"predecessor-version":[{"id":6492,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/6044\/revisions\/6492"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media\/6045"}],"wp:attachment":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media?parent=6044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/categories?post=6044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/tags?post=6044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}