{"id":414,"date":"2022-03-09T05:54:53","date_gmt":"2022-03-09T13:54:53","guid":{"rendered":"https:\/\/buildern.com\/resources\/?p=414"},"modified":"2026-10-21T00:02:13","modified_gmt":"2026-10-21T07:02:13","slug":"subcontractor-management","status":"publish","type":"post","link":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/","title":{"rendered":"8 Construction Subcontractor Management Tips To Improve Productivity"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Have you ever faced project delays due to subcontractors\u2019 issues? This can happen to any general contractor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While it\u2019s easy to place the blame on construction subs, the problem often results from poor management. In many cases, delays happen not because other workers fail to do their job, but because general contractors fail to coordinate their efforts effectively.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If a builder lacks the skills to choose the right hires and to manage their work properly, <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-rework-costs-statistics-eliminations\/\">construction rework<\/a> is almost inevitable. However, there are numerous ways to improve the process, including the construction software management tools.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this article, we will discuss practical subcontractor management tips that can help when choosing the right partners.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Table of Contents<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"#subcontractors\">Who Are Construction Subcontractors<\/a>?<\/li>\n\n\n\n<li><a href=\"#management\">Who Is Responsible for Subcontractor Management?&nbsp;<\/a><\/li>\n\n\n\n<li><a href=\"#phases\">Main Phases of Subs Management<\/a><\/li>\n\n\n\n<li><a href=\"#tips\">8 Tips for Subcontractor Management<\/a><\/li>\n\n\n\n<li><a href=\"#conclusion\">Conclusion<\/a><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/app.buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"324\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-1024x324.png\" alt=\"Free builders software for construction project management\" class=\"wp-image-651\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-1024x324.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-300x95.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-768x243.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software.png 1504w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"subcontractors\">Who Are Construction Subcontractors?&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In the construction industry, subcontractors are specialists hired by a general contractor to perform specific tasks. They are independent tradespeople who handle a particular scope of a construction project.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Subcontractors can be plumbers, electricians, drywallers, painters, roofers, and other workers with similar roles. In addition to doing a specific job, they bring <a href=\"https:\/\/buildern.com\/resources\/blog\/material-management-construction\/\" target=\"_blank\" rel=\"noreferrer noopener\">materials<\/a>, equipment, tools, workforce, and work under a defined contract and budget.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Subcontractor vs. In-House Workers&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The difference between subcontractors and in-house teams comes down to structure, control, and payment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>In-house workers<\/strong> are employed directly by the general contractor. They\u2019re on the payroll. They typically follow internal processes and schedules. These are the team members who are a part of the general contractor\u2019s crew and report to the GC or a project manager.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Subcontractors<\/strong>, on the other hand, are more independent. They run their businesses and work with multiple clients. General contractors don\u2019t manage their day-to-day operations. They work according to the scope and timeline that the sides agree to in signing the contract.&nbsp;The contract can be a traditional one or a digital bid request. In this case, the scope of work, the prices, and the necessary materials are negotiated and approved online via the <a href=\"https:\/\/buildern.com\/features\/subs-vendors-portal\" target=\"_blank\" rel=\"noreferrer noopener\">subs and vendors portal<\/a>.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"615\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subs-Portal-1-1024x615.jpg\" alt=\"\" class=\"wp-image-2778\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subs-Portal-1-1024x615.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subs-Portal-1-300x180.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subs-Portal-1-768x461.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subs-Portal-1-1536x923.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subs-Portal-1-2048x1230.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"management\">Who Is Responsible for Subcontractor Management?&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most of the time, subcontractors directly report to a general contractor and rarely communicate with clients, as their scope of work is narrower.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The general contractor is responsible for hiring subs, ensuring contract compliance, and maintaining quality and safety standards.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the size of a company, <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-project-managers\/#responsibilities\" target=\"_blank\" rel=\"noreferrer noopener\">a project manager<\/a> also supervises subs. They may be involved in reviewing bids and helping in choosing qualified subcontractors. Besides, the duties include aligning work with the project timeline. Either a general contractor or a project manager ensures that different trades do not overlap.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Types of Construction Subs<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">There are dozens of subs specialized in performing various specific tasks. Here are the most common subcontractor types and their duties:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Concrete Subcontractor: <\/strong>Pours and finishes concrete for foundations, slabs, sidewalks, and driveways.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Excavation and Earthwork Specialist: <\/strong>Prepares the site, digs foundations, and handles grading or trenching.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Carpenter: <\/strong>Focus on structural framing, cabinetry, and interior woodwork.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Electrician: <\/strong>Responsible for wiring, lighting, generators, electrical panels, and power systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Steel and Structural Specialist:<\/strong> Specializes in fabricating and erecting steel frameworks and reinforcements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Plumber: <\/strong>Installs and maintains water supply systems, drainage, and gas lines.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>HVAC Specialist: <\/strong>Installs and services heating, ventilation, and air conditioning systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Glazing Subcontractor: <\/strong>Responsible for installing glass windows, curtain walls, and storefronts.<br><br><strong>Painting Specialist<\/strong>: Handles interior and exterior painting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Regardless of the trade, it\u2019s important to manage construction subs properly, so let\u2019s discuss the best practices.&nbsp;&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"phases\">4 Main Phases of Subcontractor Management<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">There are four main phases of subcontractor management.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Hiring<\/strong>:&nbsp; This is the phase where the general contractor is sourcing subcontractors and sending <a href=\"https:\/\/buildern.com\/features\/bidding\" target=\"_blank\" rel=\"noreferrer noopener\">bid requests<\/a> to see if they can meet the project needs. During this time, they receive bids, quotes, and proposals from different construction subs.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Bid_Requests-1024x576.jpg\" alt=\"\" class=\"wp-image-2779\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Bid_Requests-1024x576.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Bid_Requests-300x169.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Bid_Requests-768x432.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Bid_Requests-1536x863.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Bid_Requests-2048x1151.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Contract Signing and Onboarding<\/strong>: General contractors outline the <a href=\"https:\/\/buildern.com\/resources\/blog\/general-contractor-contract\/\" target=\"_blank\" rel=\"noreferrer noopener\">contract<\/a>, set the policies and procedures for subcontractors\u2019 work.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Execution<\/strong>: This is a project delivery phase, which involves general monitoring of the construction project and ongoing communication between general contractors and subcontractors.&nbsp;<strong>Closeout<\/strong>: The final phase of a <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-project-planning\/\" target=\"_blank\" rel=\"noreferrer noopener\">construction project<\/a>, where all remaining tasks are completed. The general contractor conducts final checkups with subcontractors to ensure that all obligations are fulfilled. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/app.buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"297\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-1024x297.png\" alt=\"Free construction software online\" class=\"wp-image-752\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-1024x297.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-300x87.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-768x223.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software.png 1504w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"tips\">8 Tips for Subcontractor Management<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Managing subcontractors effectively is key to delivering projects on time and on budget. Here are 8 practical tips for effective management to ensure a smooth process and avoid costly mistakes.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Vet Your Subcontractors&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Different projects have specific subcontractors involved. Before hiring construction subs, you need to ensure that they are qualified to perform the required task. If you don\u2019t check it in due time, the risks are delays and budget overrun.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So here is what you should check before hiring your subcontractors:&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Previous Projects<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Study their previous projects and check a portfolio (if available) for images of their best works. Of course, it might not always be a good idea to ask a plumber to show a portfolio, but a carpenter might have one and be willing to show it off.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Feedback from Colleagues<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">It\u2019s another thing when a person tells you he can do a great job, and a completely different thing when his colleague tells you that. Of course, the subcontractor you\u2019re hiring will do his best to get the work, so only trusting his own words is not a good idea. Instead, it\u2019s better to ask for feedback from someone he has worked with. They will tell you honestly whether he is qualified for the work or has a lot of room for improvement.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Licenses and Certifications<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Each state has different licensing or certification guidelines for construction subs. These certifications usually demand minimum experience requirements and include a written exam in the specified area.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, in California, the <a href=\"https:\/\/www.cslb.ca.gov\/Consumers\/Public_Works\/What_Kind_of_Contractor_Do_You_Need.aspx\" target=\"_blank\" rel=\"noreferrer noopener\">Contractors State License Board (CSLB)<\/a> requires all subcontractors working on projects valued at $500 or more to hold a license.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In short, confirm your construction subs qualification, along with all the required certificates and licenses to have legal workers.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Safety Rules<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Everyone working in construction knows: the construction field is among the most dangerous workplaces. And although you can do your best to ensure construction site safety. If a subcontractor is not careful enough during their work, this may cause some significant safety issues, putting themselves and other workers at risk.<\/p>\n\n\n\n\n\n<h4 class=\"wp-block-heading\">Insurance<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Do your subcontractors have health and liability insurance? Unless there is insurance, a builder will be responsible for any accident at the job site.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Ensure Contracts Contain Necessary Details<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Even if you\u2019ve worked with a subcontractor before and fully trust them, that handshake deal won\u2019t protect you if they suddenly miss critical deadlines or walk off the job. It\u2019s necessary to have a solid written agreement, not just for legal reasons, but to keep expectations clear on both sides.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But here\u2019s the thing: simply signing a contract isn\u2019t enough. You want your subcontractor agreement to be as detailed as possible. That means outlining exactly what\u2019s expected:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Timelines and quality standards<\/li>\n\n\n\n<li>Safety rules&nbsp;<\/li>\n\n\n\n<li>Payment terms<\/li>\n\n\n\n<li>Who\u2019s responsible for supervising subs<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If you have any non-negotiables, this is the place to list them, as clear expectations from the start will help avoid misunderstandings.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\">There are also flow-down clauses that include safety standards and deadlines, down to all subcontractors and suppliers. This keeps everyone synced and protects in case someone else\u2019s mistake affects the project.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">One of the ways to have a smooth legal process is to use construction management software. You can create and store your subcontractor and supplier agreements in one place, send out bids and RFQs (requests for quotes). The tools enable users to get everything signed electronically.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"580\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Documents_Files-1024x580.jpg\" alt=\"\" class=\"wp-image-2781\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Documents_Files-1024x580.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Documents_Files-300x170.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Documents_Files-768x435.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Documents_Files-1536x870.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Documents_Files-2048x1160.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">In this case, bid details or in other words, terms of contract can be finalized without in-person meetings and endless email threads.&nbsp;&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Set Up Open Communication with Subcontractors<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Since subcontractors cover a considerable portion of a building firm\u2019s work, it\u2019s essential to ensure there is no miscommunication between the sides.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Either a general contractor or a project manager should inform subcontractors about all changes quickly. So, making communication channels easier is one of the solutions.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Messaging-1024x576.jpg\" alt=\"\" class=\"wp-image-2782\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Messaging-1024x576.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Messaging-300x169.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Messaging-768x432.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Messaging-1536x863.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Messaging-2048x1151.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">For example, imagine a glazing subcontractor missed an updated window specification as the revised drawing was in one of the email threads. They arrive on-site and begin installing glass units based on the outdated layout. As a result, materials are wasted and reinstallation is needed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With good software, you can:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Keep all project discussions, updates, and documents in one space<\/li>\n\n\n\n<li>Allow @mentions and task-specific comments to direct messages to the right team member<\/li>\n\n\n\n<li>Store <a href=\"https:\/\/buildern.com\/resources\/blog\/bid-leveling\/\" target=\"_blank\" rel=\"noreferrer noopener\">all bids and responses<\/a>, so you always know who said what and when<\/li>\n\n\n\n<li>Send instant notifications when there are updates or schedule changes.<br><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This kind of organized communication helps avoid confusion between the GC, project manager, and subs. In the end, you should be able to build a network of subs to have reliable partners for future projects.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Set Payment Terms<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">It\u2019s clear that delayed <a href=\"https:\/\/buildern.com\/features\/payments\" target=\"_blank\" rel=\"noreferrer noopener\">payments<\/a> are one of the causes of tension between GC and subs.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Set clear payment timelines from the beginning of the project. <a href=\"https:\/\/buildern.com\/resources\/blog\/calculate-labor-cost\/\" target=\"_blank\" rel=\"noreferrer noopener\">Calculating labor cost<\/a> is a key element for budgeting and bidding. It\u2019s essential to define how soon the sub will be paid after the GC receives payment from the client.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The payments may be different:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Completion payment: This comes when the entire subcontracted task is over.&nbsp;<\/li>\n\n\n\n<li>Progress payment: Phases tied to project milestones. The subcontractor is paid when his portion of the work is completed.<\/li>\n\n\n\n<li>\u201cPay-when-paid\u201d: This means the subcontractor will receive payment <strong>only after<\/strong> the general contractor has been paid by the client or project owner.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">There are various automated <a href=\"https:\/\/buildern.com\/features\/invoices\">invoicing tools<\/a>. GCs can review and release payments faster without long paperwork.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Build Strong, Respectful Relationships with Subs<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Management of construction subs is about relationships. Treating subs fairly, communicating clearly, and maintaining mutual respect go a long way toward building a <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-networking\/\" target=\"_blank\" rel=\"noreferrer noopener\">network<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Overloading subcontractors with unrealistic demands will affect the entire project. Eventually, the quality of work will suffer, or they will decline to work with you on future projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Try to promote a work environment based on trust and transparency.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This includes respecting their time, paying on schedule, being open to feedback, and clearly defining responsibilities.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Use Tracking Tools and Timesheets<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Another great management tip is to use <a href=\"https:\/\/buildern.com\/features\/time-tracking\" target=\"_blank\" rel=\"noreferrer noopener\">tracking tools<\/a>. Many construction companies rely on them to monitor ongoing performance.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Workers and subcontractors can clock in and out through digital timesheets. It becomes much easier to count actual hours worked and match labor costs to specific phases of the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Accurate time tracking also plays a crucial role in preventing payroll errors and disputes. With clock-in\/clock-out systems, the GC can gain a real-time view of who\u2019s on the job site and for how long. This is especially useful when managing multiple subcontractors across different trades and locations.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Digital timesheets can also be connected to job codes. This enables users to assign hours to specific tasks like framing, glazing, or electrical work.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to simplifying labor management, time tracking tools create transparency between teams.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">7. Use Construction Management Software<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Choosing the methods of construction project management is up to a general contractor. This also depends on the size of the company and the usual scope of projects. However, there are many options to automate all processes, starting from bidding to timesheets.&nbsp;&nbsp;<a href=\"https:\/\/buildern.com\/features\/construction-project-management-software\" target=\"_blank\" rel=\"noreferrer noopener\">Software <\/a>helps manage subcontractors\u2019 schedules, labor requests, assignments, and other data. It is extremely hard to track all of these elements using spreadsheets in the case of multiple projects.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"728\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Project-Overview-1-1024x728.jpg\" alt=\"\" class=\"wp-image-2783\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Project-Overview-1-1024x728.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Project-Overview-1-300x213.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Project-Overview-1-768x546.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Project-Overview-1-1536x1092.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Project-Overview-1-2048x1456.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">For instance, Buildern provides small yet important elements like using <a href=\"https:\/\/buildern.com\/resources\/blog\/qr-codes-in-construction\/\" target=\"_blank\" rel=\"noreferrer noopener\">QR codes<\/a> to see materials or messaging via an app that simplifies daily efforts.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A good software platform will also allow the general contractor and the project manager to quickly and efficiently update the schedule if changes come up.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">8. Evaluate Work Based on Client\u2019s Feedback&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Finally, once the work is completed, evaluate your subcontractors\u2019 overall performance based on your <a href=\"https:\/\/buildern.com\/resources\/blog\/clients-in-construction-industry-effective-ways-to-attract-and-keep-them\/\" target=\"_blank\" rel=\"noreferrer noopener\">client feedback.<\/a>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask whether the time spent on the project and the overall quality were worth the price. If you find that all the set criteria were met, save their contacts for future projects.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"conclusion\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Subs are one of the most important parts of any construction project. The general contractor is responsible for each phase of the project, involving subs from hiring qualified specialists and setting clear payment terms. Each step plays a role in improving collaboration and boosting productivity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, it\u2019s important to choose the best format and tools to get an efficient workflow. Putting the right systems in place, including contracts and communication, can make the difference. It\u2019s easier to avoid delays, stay within budget, and keep the quality high.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the end of the day, good subcontractor management means fewer surprises and stronger relationships.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/app.buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"324\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Get-Buildern-For-Free-1024x324.png\" alt=\"Use construction project management software online\" class=\"wp-image-635\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Get-Buildern-For-Free-1024x324.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Get-Buildern-For-Free-300x95.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Get-Buildern-For-Free-768x243.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Get-Buildern-For-Free.png 1504w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Have you ever faced project delays due to subcontractors\u2019 issues? This can happen to any general contractor. While it\u2019s easy to place the blame on construction subs, the problem often results from poor management. In many cases, delays happen not because other workers fail to do their job, but because general contractors fail to coordinate [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":5272,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[2,144],"tags":[40,38,61],"class_list":["post-414","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-construction-communication","tag-construction-management","tag-construction-management-software","tag-construction-project-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>8 Subcontractor Management Tips To Improve Productivity<\/title>\n<meta name=\"description\" content=\"Want your construction company to succeed in big projects and meet your clients&#039; expectations? The subcontractor management tips will help!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"8 Subcontractor Management Tips To Improve Productivity\" \/>\n<meta property=\"og:description\" content=\"Want your construction company to succeed in big projects and meet your clients&#039; expectations? The subcontractor management tips will help!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/\" \/>\n<meta property=\"og:site_name\" content=\"Buildern resources\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/buildernsoft\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-09T13:54:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T07:02:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subcontractor-Management-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"501\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Meri Markaryan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Meri Markaryan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/\"},\"author\":{\"name\":\"Meri Markaryan\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/person\\\/51b7b24ec569683e9d0308be4b5161a8\"},\"headline\":\"8 Construction Subcontractor Management Tips To Improve Productivity\",\"datePublished\":\"2022-03-09T13:54:53+00:00\",\"dateModified\":\"2026-10-21T07:02:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/\"},\"wordCount\":2192,\"publisher\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Subcontractor-Management-1.jpg\",\"keywords\":[\"Construction Management\",\"Construction Management Software\",\"Construction project management\"],\"articleSection\":[\"Construction Blog\",\"Construction Communication\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/\",\"name\":\"8 Subcontractor Management Tips To Improve Productivity\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Subcontractor-Management-1.jpg\",\"datePublished\":\"2022-03-09T13:54:53+00:00\",\"dateModified\":\"2026-10-21T07:02:13+00:00\",\"description\":\"Want your construction company to succeed in big projects and meet your clients' expectations? The subcontractor management tips will help!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/#primaryimage\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Subcontractor-Management-1.jpg\",\"contentUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/Subcontractor-Management-1.jpg\",\"width\":768,\"height\":501,\"caption\":\"subcontractor management\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/subcontractor-management\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"8 Construction Subcontractor Management Tips To Improve Productivity\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#website\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\",\"name\":\"Buildern resources\",\"description\":\"Buildern resources\",\"publisher\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/buildern.com\\\/resources\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\",\"name\":\"Buildern resources\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Buildern-logo..png\",\"contentUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Buildern-logo..png\",\"width\":401,\"height\":137,\"caption\":\"Buildern resources\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/buildernsoft\",\"https:\\\/\\\/www.instagram.com\\\/buildern.soft\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/buildern\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@buildern\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/person\\\/51b7b24ec569683e9d0308be4b5161a8\",\"name\":\"Meri Markaryan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"caption\":\"Meri Markaryan\"},\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/author\\\/meri-markaryan\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"8 Subcontractor Management Tips To Improve Productivity","description":"Want your construction company to succeed in big projects and meet your clients' expectations? The subcontractor management tips will help!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/","og_locale":"en_US","og_type":"article","og_title":"8 Subcontractor Management Tips To Improve Productivity","og_description":"Want your construction company to succeed in big projects and meet your clients' expectations? The subcontractor management tips will help!","og_url":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/","og_site_name":"Buildern resources","article_publisher":"https:\/\/www.facebook.com\/buildernsoft","article_published_time":"2022-03-09T13:54:53+00:00","article_modified_time":"2026-10-21T07:02:13+00:00","og_image":[{"width":768,"height":501,"url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subcontractor-Management-1.jpg","type":"image\/jpeg"}],"author":"Meri Markaryan","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Meri Markaryan","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/#article","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/"},"author":{"name":"Meri Markaryan","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8"},"headline":"8 Construction Subcontractor Management Tips To Improve Productivity","datePublished":"2022-03-09T13:54:53+00:00","dateModified":"2026-10-21T07:02:13+00:00","mainEntityOfPage":{"@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/"},"wordCount":2192,"publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"image":{"@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subcontractor-Management-1.jpg","keywords":["Construction Management","Construction Management Software","Construction project management"],"articleSection":["Construction Blog","Construction Communication"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/","url":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/","name":"8 Subcontractor Management Tips To Improve Productivity","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/#website"},"primaryImageOfPage":{"@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/#primaryimage"},"image":{"@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subcontractor-Management-1.jpg","datePublished":"2022-03-09T13:54:53+00:00","dateModified":"2026-10-21T07:02:13+00:00","description":"Want your construction company to succeed in big projects and meet your clients' expectations? The subcontractor management tips will help!","breadcrumb":{"@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/#primaryimage","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subcontractor-Management-1.jpg","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subcontractor-Management-1.jpg","width":768,"height":501,"caption":"subcontractor management"},{"@type":"BreadcrumbList","@id":"https:\/\/buildern.com\/resources\/blog\/subcontractor-management\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/buildern.com\/resources\/"},{"@type":"ListItem","position":2,"name":"8 Construction Subcontractor Management Tips To Improve Productivity"}]},{"@type":"WebSite","@id":"https:\/\/buildern.com\/resources\/#website","url":"https:\/\/buildern.com\/resources\/","name":"Buildern resources","description":"Buildern resources","publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/buildern.com\/resources\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/buildern.com\/resources\/#organization","name":"Buildern resources","url":"https:\/\/buildern.com\/resources\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","width":401,"height":137,"caption":"Buildern resources"},"image":{"@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/buildernsoft","https:\/\/www.instagram.com\/buildern.soft\/","https:\/\/www.linkedin.com\/company\/buildern\/","https:\/\/www.youtube.com\/@buildern"]},{"@type":"Person","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8","name":"Meri Markaryan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","caption":"Meri Markaryan"},"url":"https:\/\/buildern.com\/resources\/author\/meri-markaryan\/"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/03\/Subcontractor-Management-1.jpg","post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/414","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/comments?post=414"}],"version-history":[{"count":10,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/414\/revisions"}],"predecessor-version":[{"id":6208,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/414\/revisions\/6208"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media\/5272"}],"wp:attachment":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media?parent=414"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/categories?post=414"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/tags?post=414"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}