{"id":3205,"date":"2025-09-25T05:10:40","date_gmt":"2025-09-25T12:10:40","guid":{"rendered":"https:\/\/buildern.com\/resources\/?p=3205"},"modified":"2026-10-21T01:38:23","modified_gmt":"2026-10-21T08:38:23","slug":"residential-construction-technology-trends","status":"publish","type":"post","link":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/","title":{"rendered":"13 Residential Construction Technology Trends to Watch"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In the past few years, I\u2019ve seen residential construction change faster than at any other time in my career. The pace of new <a href=\"https:\/\/buildern.com\/features\/construction-project-management-software\" target=\"_blank\" rel=\"noreferrer noopener\">project management tools<\/a> and methods entering the field is no longer gradual. It\u2019s constant, and it\u2019s reshaping how homes are designed, built, and managed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What stands out to me is how residential construction technology trends solve the long-standing problems that used to hold projects back. Delays, cost overruns, and inefficiency have always been part of construction.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Now, I see more builders turning to advanced materials, automated methods, and digital platforms to keep <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-cost-tracking\/\" target=\"_blank\" rel=\"noreferrer noopener\">construction cost tracking<\/a> predictable and timelines steady.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The shift reflects a focus on practical solutions that actually change how homes get built. Therefore, I\u2019ll be sharing the 13 most impactful residential construction technology trends we have already witnessed and expect to see growing, and making our industry expand.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Table of Contents<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"#stats\">Current Industry Statistics<\/a><\/li>\n\n\n\n<li><a href=\"#innovative-materials\">Innovative Building Materials<\/a><\/li>\n\n\n\n<li><a href=\"#modern-methods\">Modern Construction Methods<\/a><\/li>\n\n\n\n<li><a href=\"#digital-transformation\">Digital Transformation in Construction<\/a><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/app.buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"324\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-1024x324.png\" alt=\"Free builders software for construction project management\" class=\"wp-image-651\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-1024x324.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-300x95.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-768x243.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software.png 1504w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"stats\">Current Industry Statistics<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Residential construction is expected to account for a growing share of tech adoption. According to a 2024 Statista survey, nearly <a href=\"https:\/\/www.rics.org\/content\/dam\/ricsglobal\/documents\/research\/Digitalisation-in-construction-report-2024.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>41% of mid-sized U.S. homebuilders<\/strong><\/a><strong> <\/strong>reported adopting at least one advanced digital tool in their projects, a sharp rise<strong> compared to 32% the year before<\/strong>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That number is only going up. I believe that the firms that adapt early will have a clear advantage in efficiency, sustainability, and client trust.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"innovative-materials\">Innovative Building Materials<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">New materials are shaping how homes perform, both during construction and long after. Stronger composites, energy-efficient products, and smarter insulation methods are now standard discussion points on projects. I\u2019ve noticed that when these materials are applied consistently, they not only cut operating costs for homeowners but also help builders deliver projects with fewer callbacks and warranty claims.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Recent market data backs this up. A 2025 Allied Market Research report shows that the global advanced building materials market is projected to reach<strong> <\/strong><a href=\"https:\/\/www.alliedmarketresearch.com\/advanced-building-materials-market-A16498\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>$111.7 billion by 2031<\/strong><\/a>, growing at over <strong>6.8%<\/strong> annually, with <a href=\"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/\" target=\"_blank\" rel=\"noreferrer noopener\">residential projects<\/a> being one of the top drivers. Such growth tells me that these materials are not niche anymore as they are entering mainstream housing.<\/p>\n\n\n\n\n\n<h3 class=\"wp-block-heading\">1. Cross-Laminated Timber (CLT)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">I\u2019ve worked on projects where cross-laminated timber (CLT) replaced traditional framing, and the difference in speed was obvious. Large prefabricated panels go up quickly, reducing labor demands and cutting down waste.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"840\" height=\"561\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Cross-Laminated-Timber-CLT.jpg\" alt=\"cross laminated timber\" class=\"wp-image-3213\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Cross-Laminated-Timber-CLT.jpg 840w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Cross-Laminated-Timber-CLT-300x200.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Cross-Laminated-Timber-CLT-768x513.jpg 768w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/><figcaption class=\"wp-element-caption\"><em>Image Source: ArchDaily<\/em><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">CLT is also making waves because of its sustainability profile. According to a study, using CLT can lower a building\u2019s carbon footprint by up to <a href=\"https:\/\/www.sciencedirect.com\/science\/article\/abs\/pii\/S0360132324000374\" target=\"_blank\" rel=\"noreferrer noopener\">26.5%<\/a> compared to concrete or steel framing.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The rapid adoption makes it especially attractive for environmentally conscious clients.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Insulated Concrete Forms (ICFs)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">ICFs are not new, but I\u2019ve noticed their use in residential builds increasing over the past two years. These interlocking blocks create insulated walls that outperform traditional wood framing in energy efficiency. Homeowners notice the savings in utility bills, and builders appreciate the durability against extreme weather.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Smart Glass and Advanced Insulation Materials<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Smart glass is no longer limited to high-end commercial buildings. It can be specified for residential projects, especially in energy-conscious urban developments. Smart glass construction technology automatically adjusts transparency to regulate light and temperature, lowering HVAC loads.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"470\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Smart-Glass-Example-1024x470.jpg\" alt=\"smart glass technology\" class=\"wp-image-3214\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Smart-Glass-Example-1024x470.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Smart-Glass-Example-300x138.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Smart-Glass-Example-768x353.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Smart-Glass-Example-1536x706.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Smart-Glass-Example.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Image Source: privasee.uk<\/em><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Pair that with advanced insulation foams and phase-change materials, and the home performs at an entirely different level. According to DOE 2024 data, smart glass installations can <a href=\"https:\/\/www.researchgate.net\/publication\/274553553_Smart_Glass_and_Its_Potential_in_Energy_Savings\" target=\"_blank\" rel=\"noreferrer noopener\">cut annual residential cooling loads by 25-30%<\/a>. That\u2019s a measurable impact for both owners and builders.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Self-Healing Concrete<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This technology is still progressing, but I\u2019ve followed pilot projects closely. Self-healing concrete uses embedded bacteria or microcapsules to automatically seal small cracks when exposed to water.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In residential foundations and driveways, this could dramatically extend service life. Early field tests even report that the maintenance costs may be cut significantly thanks to self-healing concrete, resulting in stronger buildings over a 20-year period. For builders, this means fewer callbacks and warranty claims.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"modern-methods\">Modern Construction Methods<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Alongside new materials, I\u2019ve watched construction methods shift just as quickly. The pressure to build faster, cheaper, and greener is forcing builders to rethink how homes come together. Traditional stick framing is still common, but newer methods are gaining ground because they solve persistent problems from labor shortages to energy use.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Industry adoption is accelerating. The growth we see now matches what I\u2019ve seen on the ground: when projects adopt these methods, the learning curve is real, but the gains in speed and efficiency are hard to ignore.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. 3D Volumetric Construction<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">3D-printed components move from small demo projects to actual housing starts. Volumetric construction of entire rooms or modules built off-site is speeding up delivery times. A 2024 survey in Europe reported that using volumetric methods can <a href=\"https:\/\/www.mckinsey.com\/~\/media\/mckinsey\/business%20functions\/operations\/our%20insights\/modular%20construction%20from%20projects%20to%20products%20new\/modular-construction-from-projects-to-products-full-report-new.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">cut build schedules by 20-50%<\/a>, depending on project size.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"595\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/volumetric-modular-construction.jpg\" alt=\"volumetric modular construction example\" class=\"wp-image-3215\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/volumetric-modular-construction.jpg 1000w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/volumetric-modular-construction-300x179.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/volumetric-modular-construction-768x457.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><figcaption class=\"wp-element-caption\"><em>Image Source: Villavo<\/em><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">As a result, for residential builders facing tight labor markets, this approach is becoming a serious option, not just an experiment.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Robotics and Automated Machinery<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Robots are no longer science fiction on construction sites. We now have brick-laying robots and rebar-tying machines in action. They don\u2019t replace the crew but handle repetitive, labor-heavy tasks, letting skilled workers focus on detail work.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to a 2025 Deloitte report, contractors using smart manufacturing methods reported labor productivity gains of up to <a href=\"https:\/\/www.deloitte.com\/us\/en\/about\/press-room\/deloitte-2025-smart-manufacturing-survey.html\" target=\"_blank\" rel=\"noreferrer noopener\">20%<\/a>. For smaller firms, the entry cost is still high, but adoption is spreading as rental options and service providers grow.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Robotics-In-Construction-1024x576.jpg\" alt=\"robot example in construction \" class=\"wp-image-3216\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Robotics-In-Construction-1024x576.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Robotics-In-Construction-300x169.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Robotics-In-Construction-768x432.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Robotics-In-Construction-1536x864.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/Robotics-In-Construction.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Image Source: Paacademy<\/em><\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">7. Green Roof and Passive House Construction Techniques<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Sustainability is not just a selling point anymore, as it becomes a standard regulation in most regions. I\u2019ve been involved in projects where <a href=\"https:\/\/passiv.de\/en\/02_informations\/02_passive-house-requirements\/02_passive-house-requirements.htm\" target=\"_blank\" rel=\"noreferrer noopener\">Passive House standards<\/a> cut energy demand to a fraction of typical builds. Green roofs, while more common in urban areas, are being tested in suburban housing as well.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A 2024 Passive House Institute study showed homes built to the standard used up to <a href=\"https:\/\/www.sciencedirect.com\/science\/article\/abs\/pii\/S2352710223020296\" target=\"_blank\" rel=\"noreferrer noopener\">80%<\/a> less heating and cooling energy. The residential construction technology is not just good for the environment, as it also locks in long-term affordability for owners.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">8. Drones in Residential Construction<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Drones are quickly moving from \u201cnice to have\u201d to everyday tools. <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-superintendent\/\" target=\"_blank\" rel=\"noreferrer noopener\">Site superintendents<\/a> use them to document progress, verify deliveries, and even assist in roof inspections. This cuts down the need for multiple site visits and reduces safety risks.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For us, the biggest gain has been in progress reporting, while clients appreciate visual updates that show exactly where the project stands.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"digital-transformation\">Digital Transformation in Construction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">From my perspective, digital tools are no longer optional. I\u2019ve watched residential builders struggle with delays, miscommunication, and paperwork, only to adopt digital systems later and see immediate improvements. The shift is removing delays that used to cost weeks and thousands of dollars.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Data backs this up. A 2025 Dodge Construction Network survey found that builders using integrated digital platforms have better decision-making processes, <a href=\"https:\/\/marineconstructionmagazine.com\/article\/new-study-from-dodge-construction-network-reveals-digital-transformation-led-by-construction-owners\/\" target=\"_blank\" rel=\"noreferrer noopener\">growing by 66%<\/a>. That reflects what I\u2019ve seen myself: once communication moves to real-time platforms, the excuses about <em>\u201cI didn\u2019t see the update\u201d <\/em>disappear.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">9. Artificial Intelligence (AI) in Residential Construction<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">AI has moved from hype to actual job site applications. Today, AI tools analyze schedules, flag risks, and even predict which subcontractors are likely to miss deadlines.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to a recent PwC report, <strong>AI-driven project management systems improved forecasting accuracy by <\/strong><a href=\"https:\/\/www.pwc.com\/gx\/en\/issues\/artificial-intelligence\/job-barometer\/2025\/report.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>nearly 25%<\/strong><\/a>. In residential construction, that means tighter cost control and fewer surprises for both builders and homeowners.<\/p>\n\n\n\n\n\n<h3 class=\"wp-block-heading\">10. Digital Twins in Residential Construction<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Digital twins once felt like something only mega-projects would use. But they can also be applied in housing developments, creating virtual replicas of homes before they\u2019re built. This lets teams test different designs, materials, and even energy-use scenarios before construction starts.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Digital twins also support ongoing facility management after construction is complete. Homeowners and developers can use the model to monitor system performance, predict maintenance needs, and track energy efficiency in real time. This residential construction technology creates a feedback loop where lessons learned from completed projects can be applied directly to future designs.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">11. Augmented Reality (AR) in Construction<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/AR-In-Construction-1024x576.jpg\" alt=\"AR in residnential construction technology trends\" class=\"wp-image-3217\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/AR-In-Construction-1024x576.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/AR-In-Construction-300x169.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/AR-In-Construction-768x432.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/AR-In-Construction-1536x864.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/AR-In-Construction.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">AR has started showing up on job sites more often than you think. Our team used AR to overlay plumbing and electrical layouts on walls before drywall went up. It immediately showed where conflicts would happen. In one project, this saved days of rework by catching errors early.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Beyond clash detection, AR also helps improve communication with clients and inspectors. Being able to walk through a space and see design elements in place makes approvals faster and reduces misunderstandings.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">12. Cloud-Based Project Management Software<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">My team relies on <a href=\"https:\/\/buildern.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">cloud-based construction systems<\/a> to bring everyone involved in the project together. Instead of field supervisors sending updates by text, everything goes into one shared platform.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Moreover, office staff, subcontractors, and even clients can see the same data. It reduces endless back-and-forth and keeps team messaging and accountability clear.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-1024x576.jpg\" alt=\"Construction messaging with team\" class=\"wp-image-2651\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-1024x576.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-300x169.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-768x432.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-1536x863.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-2048x1151.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Cloud-based platforms also create a single source of truth for all project data. Drawings, RFIs, change orders, and schedules are updated in real time, so there\u2019s no confusion about which version is current. Specialized software helps subcontractors plan their work more accurately, while office teams can track budgets and commitments without waiting for paper trails.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"648\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/11\/Budget-1024x648.jpg\" alt=\"Construction budget online monitoring\" class=\"wp-image-2751\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/11\/Budget-1024x648.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/11\/Budget-300x190.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/11\/Budget-768x486.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/11\/Budget-1536x972.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/11\/Budget-2048x1296.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Over time, it builds a documented history of every decision made on the job, which is invaluable when disputes or warranty issues arise.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">13. Building Information Modeling (BIM) for Residential Projects<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For years, BIM was viewed as a tool mainly for commercial buildings. That\u2019s changing fast. I\u2019ve worked on residential projects where BIM streamlined coordination between architects, engineers, and builders. It makes the design more transparent, reduces clashes, and gives owners a clearer view of what they\u2019ll get.&nbsp;<\/p>\n\n\n\n\n\n<h2 class=\"wp-block-heading\">The Bottom Thoughts<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Looking back at these 13 trends, a few ideas stand out clearly:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>I\u2019ve seen innovative materials like CLT and ICFs improve both performance and sustainability in residential projects.<\/li>\n\n\n\n<li>New construction methods, from 3D volumetric to robotics, are shortening build times and addressing labor challenges.<\/li>\n\n\n\n<li>Digital tools, especially AI, AR, and BIM, are changing how teams communicate and avoid costly rework.<\/li>\n\n\n\n<li>Cloud-based systems and dashboards are keeping field and office teams aligned in real time.<\/li>\n\n\n\n<li>Builders who adopt these technologies early position themselves for stronger client trust and better long-term margins.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/app.buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"297\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software-1024x297.png\" alt=\"Free construction project management software online\" class=\"wp-image-742\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software-1024x297.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software-300x87.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software-768x223.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software.png 1504w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<section class=\"wp-block-buildern-article-faq article-faq\" data-article-faq=\"\"><h2 class=\"article-faq__title\">Frequently Asked Questions<\/h2><div class=\"article-faq__items\">\n<details class=\"wp-block-buildern-article-faq-item article-faq__item\"><summary class=\"article-faq__question\"><h4 class=\"article-faq__question-title\">What Is Residential Construction Technology?<\/h4><span class=\"article-faq__chevron\" aria-hidden=\"true\"><svg width=\"12\" height=\"8\" viewBox=\"0 0 12 8\" fill=\"none\" focusable=\"false\" aria-hidden=\"true\"><path d=\"M1 1.5L6 6.5L11 1.5\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span><\/summary><div class=\"article-faq__answer\">\n<p class=\"wp-block-paragraph\">From my own work and research, I define residential construction technology as every material, method, and digital tool that improves how homes are built. This includes advanced building materials like CLT, modern methods such as modular and 3D construction, and software platforms that connect the field with the office. It\u2019s not limited to one category, but includes a combination that drives better cost predictability, faster delivery, and more sustainable housing.<\/p>\n<\/div><\/details>\n\n<details class=\"wp-block-buildern-article-faq-item article-faq__item\"><summary class=\"article-faq__question\"><h4 class=\"article-faq__question-title\">How Is AI Being Applied in Homebuilding Projects?<\/h4><span class=\"article-faq__chevron\" aria-hidden=\"true\"><svg width=\"12\" height=\"8\" viewBox=\"0 0 12 8\" fill=\"none\" focusable=\"false\" aria-hidden=\"true\"><path d=\"M1 1.5L6 6.5L11 1.5\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span><\/summary><div class=\"article-faq__answer\">\n<p class=\"wp-block-paragraph\">On the project management side, AI tools forecast risks, highlight schedule conflicts, and improve cost predictions. On the design side, AI helps analyze multiple layout options and material choices in seconds. In residential projects, I\u2019ve used AI-enabled systems to flag potential delays in subcontractor work before they became major problems. The result is tighter control over timelines and budgets.<\/p>\n<\/div><\/details>\n\n<details class=\"wp-block-buildern-article-faq-item article-faq__item\"><summary class=\"article-faq__question\"><h4 class=\"article-faq__question-title\">What Are the Latest Construction Technologies?<\/h4><span class=\"article-faq__chevron\" aria-hidden=\"true\"><svg width=\"12\" height=\"8\" viewBox=\"0 0 12 8\" fill=\"none\" focusable=\"false\" aria-hidden=\"true\"><path d=\"M1 1.5L6 6.5L11 1.5\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/span><\/summary><div class=\"article-faq__answer\">\n<p class=\"wp-block-paragraph\">The list grows every year, but a few stand out. In materials, CLT, ICFs, and self-healing concrete are gaining traction. In methods, robotics, drones, and modular builds are pushing speed and consistency. AI, AR, BIM, and cloud project management are also becoming standard tools on residential sites. I\u2019ve noticed that the most successful builders are the ones blending these areas rather than relying on a single innovation.<\/p>\n<\/div><\/details>\n<\/div><\/section>\n","protected":false},"excerpt":{"rendered":"<p>In the past few years, I\u2019ve seen residential construction change faster than at any other time in my career. The pace of new project management tools and methods entering the field is no longer gradual. It\u2019s constant, and it\u2019s reshaping how homes are designed, built, and managed. What stands out to me is how residential [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":3220,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[2,27],"tags":[33],"class_list":["post-3205","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-construction-company-blog","tag-construction-trends"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>13 Residential Construction Technology Trends to Watch<\/title>\n<meta name=\"description\" content=\"I\u2019ll be sharing the 13 most impactful technology trends we have already witnessed and expect to see growing, and making our industry expand.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"13 Residential Construction Technology Trends to Watch\" \/>\n<meta property=\"og:description\" content=\"I\u2019ll be sharing the 13 most impactful technology trends we have already witnessed and expect to see growing, and making our industry expand.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/\" \/>\n<meta property=\"og:site_name\" content=\"Buildern resources\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/buildernsoft\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-25T12:10:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T08:38:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/BLOG_COVER_Residential-Construction-Technology-Trends-1024x668.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"668\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Tamara Melkonyan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tamara Melkonyan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/\"},\"author\":{\"name\":\"Tamara Melkonyan\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/person\\\/50bbd2b2ece5566f3b31b7db9b5a1bb5\"},\"headline\":\"13 Residential Construction Technology Trends to Watch\",\"datePublished\":\"2025-09-25T12:10:40+00:00\",\"dateModified\":\"2026-10-21T08:38:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/\"},\"wordCount\":1928,\"publisher\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/BLOG_COVER_Residential-Construction-Technology-Trends.jpg\",\"keywords\":[\"construction trends\"],\"articleSection\":[\"Construction Blog\",\"Construction Company\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/\",\"name\":\"13 Residential Construction Technology Trends to Watch\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/BLOG_COVER_Residential-Construction-Technology-Trends.jpg\",\"datePublished\":\"2025-09-25T12:10:40+00:00\",\"dateModified\":\"2026-10-21T08:38:23+00:00\",\"description\":\"I\u2019ll be sharing the 13 most impactful technology trends we have already witnessed and expect to see growing, and making our industry expand.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/#primaryimage\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/BLOG_COVER_Residential-Construction-Technology-Trends.jpg\",\"contentUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/BLOG_COVER_Residential-Construction-Technology-Trends.jpg\",\"width\":2172,\"height\":1416,\"caption\":\"Residential construction technology trends\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/blog\\\/residential-construction-technology-trends\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"13 Residential Construction Technology Trends to Watch\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#website\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\",\"name\":\"Buildern resources\",\"description\":\"Buildern resources\",\"publisher\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/buildern.com\\\/resources\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\",\"name\":\"Buildern resources\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Buildern-logo..png\",\"contentUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Buildern-logo..png\",\"width\":401,\"height\":137,\"caption\":\"Buildern resources\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/buildernsoft\",\"https:\\\/\\\/www.instagram.com\\\/buildern.soft\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/buildern\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@buildern\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/person\\\/50bbd2b2ece5566f3b31b7db9b5a1bb5\",\"name\":\"Tamara Melkonyan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/30f65efbbdc15b508aa91fd2907ea06857e7e22b2052434e9a73aebc54ae04c9?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/30f65efbbdc15b508aa91fd2907ea06857e7e22b2052434e9a73aebc54ae04c9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/30f65efbbdc15b508aa91fd2907ea06857e7e22b2052434e9a73aebc54ae04c9?s=96&d=mm&r=g\",\"caption\":\"Tamara Melkonyan\"},\"description\":\"Tamara specializes in delivering high-quality B2B and B2C content to SaaS companies, with extensive experience writing for the construction industry. She combines her expertise in linguistics and content marketing with a passion for simplifying complex concepts into clear and impactful messaging.\",\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/tamara-melkonyan\\\/\"],\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/author\\\/tamara-melkonyan\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"13 Residential Construction Technology Trends to Watch","description":"I\u2019ll be sharing the 13 most impactful technology trends we have already witnessed and expect to see growing, and making our industry expand.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/","og_locale":"en_US","og_type":"article","og_title":"13 Residential Construction Technology Trends to Watch","og_description":"I\u2019ll be sharing the 13 most impactful technology trends we have already witnessed and expect to see growing, and making our industry expand.","og_url":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/","og_site_name":"Buildern resources","article_publisher":"https:\/\/www.facebook.com\/buildernsoft","article_published_time":"2025-09-25T12:10:40+00:00","article_modified_time":"2026-10-21T08:38:23+00:00","og_image":[{"width":1024,"height":668,"url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/BLOG_COVER_Residential-Construction-Technology-Trends-1024x668.jpg","type":"image\/jpeg"}],"author":"Tamara Melkonyan","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tamara Melkonyan","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/#article","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/"},"author":{"name":"Tamara Melkonyan","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/50bbd2b2ece5566f3b31b7db9b5a1bb5"},"headline":"13 Residential Construction Technology Trends to Watch","datePublished":"2025-09-25T12:10:40+00:00","dateModified":"2026-10-21T08:38:23+00:00","mainEntityOfPage":{"@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/"},"wordCount":1928,"publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"image":{"@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/BLOG_COVER_Residential-Construction-Technology-Trends.jpg","keywords":["construction trends"],"articleSection":["Construction Blog","Construction Company"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/","url":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/","name":"13 Residential Construction Technology Trends to Watch","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/#website"},"primaryImageOfPage":{"@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/#primaryimage"},"image":{"@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/BLOG_COVER_Residential-Construction-Technology-Trends.jpg","datePublished":"2025-09-25T12:10:40+00:00","dateModified":"2026-10-21T08:38:23+00:00","description":"I\u2019ll be sharing the 13 most impactful technology trends we have already witnessed and expect to see growing, and making our industry expand.","breadcrumb":{"@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/#primaryimage","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/BLOG_COVER_Residential-Construction-Technology-Trends.jpg","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/BLOG_COVER_Residential-Construction-Technology-Trends.jpg","width":2172,"height":1416,"caption":"Residential construction technology trends"},{"@type":"BreadcrumbList","@id":"https:\/\/buildern.com\/resources\/blog\/residential-construction-technology-trends\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/buildern.com\/resources\/"},{"@type":"ListItem","position":2,"name":"13 Residential Construction Technology Trends to Watch"}]},{"@type":"WebSite","@id":"https:\/\/buildern.com\/resources\/#website","url":"https:\/\/buildern.com\/resources\/","name":"Buildern resources","description":"Buildern resources","publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/buildern.com\/resources\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/buildern.com\/resources\/#organization","name":"Buildern resources","url":"https:\/\/buildern.com\/resources\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","width":401,"height":137,"caption":"Buildern resources"},"image":{"@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/buildernsoft","https:\/\/www.instagram.com\/buildern.soft\/","https:\/\/www.linkedin.com\/company\/buildern\/","https:\/\/www.youtube.com\/@buildern"]},{"@type":"Person","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/50bbd2b2ece5566f3b31b7db9b5a1bb5","name":"Tamara Melkonyan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/30f65efbbdc15b508aa91fd2907ea06857e7e22b2052434e9a73aebc54ae04c9?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/30f65efbbdc15b508aa91fd2907ea06857e7e22b2052434e9a73aebc54ae04c9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/30f65efbbdc15b508aa91fd2907ea06857e7e22b2052434e9a73aebc54ae04c9?s=96&d=mm&r=g","caption":"Tamara Melkonyan"},"description":"Tamara specializes in delivering high-quality B2B and B2C content to SaaS companies, with extensive experience writing for the construction industry. She combines her expertise in linguistics and content marketing with a passion for simplifying complex concepts into clear and impactful messaging.","sameAs":["https:\/\/www.linkedin.com\/in\/tamara-melkonyan\/"],"url":"https:\/\/buildern.com\/resources\/author\/tamara-melkonyan\/"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/09\/BLOG_COVER_Residential-Construction-Technology-Trends.jpg","post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/3205","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/comments?post=3205"}],"version-history":[{"count":6,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/3205\/revisions"}],"predecessor-version":[{"id":6411,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/3205\/revisions\/6411"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media\/3220"}],"wp:attachment":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media?parent=3205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/categories?post=3205"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/tags?post=3205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}