{"id":2734,"date":"2025-07-19T23:00:00","date_gmt":"2025-07-20T06:00:00","guid":{"rendered":"https:\/\/buildern.com\/resources\/?p=2734"},"modified":"2025-09-02T03:07:42","modified_gmt":"2025-09-02T10:07:42","slug":"advertising-for-contractors","status":"publish","type":"post","link":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/","title":{"rendered":"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">How to advertise a building business without spending too much? General contractors work in a very competitive environment. Like any other business, they want to reach more customers.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Having a flashy banner or digital ads is a good tactic. However, the number one concern is how to target the right homeowners. The goal is not to simply have ads looming before clients\u2019 eyes. The real challenge is making sure every dollar works to bring in leads.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this blog, we will discuss how smart advertising for contractors works and how to present your services and <a href=\"https:\/\/buildern.com\/resources\/case-study\/\" target=\"_blank\" rel=\"noreferrer noopener\">case studies<\/a> wisely through ads.\u00a0\u00a0<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Table of Contents<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li id=\"Contractors\"><a href=\"#contractors\">Advertising vs. Marketing for Contractors\u00a0<\/a><\/li>\n\n\n\n<li><a href=\"#campaign\">Set the Stage for Ad Campaign<\/a><\/li>\n\n\n\n<li><a href=\"#channels\">Best Advertising Channels for Contractors<\/a>\u00a0<\/li>\n\n\n\n<li><a href=\"#ads\">Marketing Beyond Ads\u00a0<\/a><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/app.buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img decoding=\"async\" width=\"1024\" height=\"297\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-1024x297.png\" alt=\"Free construction software online\" class=\"wp-image-752\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-1024x297.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-300x87.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-768x223.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software.png 1504w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"contractors\">Advertising vs. Marketing for Contractors<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Some businesses believe marketing and advertising are the same until they spend money on ads that don\u2019t bring results. The truth is, advertising is just one piece of the marketing strategy.\u00a0 Knowing the difference can be the key to standing out in a competitive industry like construction.\u00a0\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-buildern-resources wp-block-embed-buildern-resources\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"yEIiFiKibP\"><a href=\"https:\/\/buildern.com\/resources\/blog\/construction-marketing\/\">What Makes Construction Marketing Work: 7 Proven Tactics to Try in 2025\u00a0<\/a><\/blockquote><iframe class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"&#8220;What Makes Construction Marketing Work: 7 Proven Tactics to Try in 2025\u00a0&#8221; &#8212; Buildern resources\" src=\"https:\/\/buildern.com\/resources\/blog\/construction-marketing\/embed\/#?secret=aRJzVtH3Gb#?secret=yEIiFiKibP\" data-secret=\"yEIiFiKibP\" width=\"500\" height=\"282\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Marketing Builds the Message\u00a0<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Marketing is a broad range of activities, including advertising. It\u2019s about a strategy that builds trust and shapes the perception of how people see your business. Marketing starts with positioning the building firm.<strong> Why should a homeowner choose this particular general contractor over others?&nbsp;&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The main idea is to create case studies and real-time photos that people will remember when it\u2019s time to build. For example, if your social media channels are full of real project photos, people might think: \u201cThis contractor builds exactly the house that I want.\u201d<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">So, a good marketing strategy for contractors includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Brand positioning<br><\/li>\n\n\n\n<li>Client testimonials and case studies<br><\/li>\n\n\n\n<li>A strong digital presence (website, social media, SEO)<br><\/li>\n\n\n\n<li>Educational content like blogs, project updates, or FAQs&nbsp;<\/li>\n<\/ul>\n<\/blockquote>\n\n\n\n<h3 class=\"wp-block-heading\">Advertising Delivers the Message&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Advertising for general contractors is a paid method of promotion. In other words, it\u2019s how you get in front of the right audience fast.&nbsp;<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">The advertising channels include:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Banners (outdoor banners and display ads)<\/li>\n\n\n\n<li>PPC ads<\/li>\n\n\n\n<li>Social media ads<\/li>\n<\/ul>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">To sum up, marketing encompasses both organic and paid methods of promotion. Meanwhile, advertising is only a paid way of showcasing the contractor&#8217;s services.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, advertising without marketing is like building a custom home without blueprints. When aligned, they generate qualified leads that are ready to convert. Adding <a href=\"https:\/\/buildern.com\/features\/construction-project-management-software\" target=\"_blank\" rel=\"noreferrer noopener\">construction management software<\/a> into the mix, both marketing and advertising become even stronger. Let\u2019s see how it works.\u00a0<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"campaign\">Set the Stage for Ad Campaign&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction business owners may think advertising is just one step. But the reality is that before spending money on ads, the contractor should make sure he is ready for a flow of calls and messages. Here are some key points to take into account before running any ad campaign.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Prepare for Inquiries and Follow-Ups<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No matter if you are running a street banner or a digital ad on Google, the moment a campaign goes live, you need to respond fast.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Clients don\u2019t wait around. If they reach out and do not hear back quickly, there\u2019s a chance they will move on and never return. A slow reply can make you look unreliable, even if your work is top quality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Once leads start coming in, make sure your team is prepared to:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Respond promptly to emails, phone calls, or form submissions,\u00a0<\/li>\n\n\n\n<li>Track each inquiry,<\/li>\n\n\n\n<li>Use pre-written templates for quotes and <a href=\"https:\/\/buildern.com\/features\/estimating\" target=\"_blank\" rel=\"noreferrer noopener\">estimates<\/a>.\u00a0<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Advertising only works when it leads to real conversations. In case there is no capacity to follow up consistently, consider attracting extra help.&nbsp;&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Have a Great Google Business Profile<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">If a client finds the ads interesting, the next step is to Google the business. The <a href=\"https:\/\/www.google.com\/business\/\" target=\"_blank\" rel=\"noreferrer noopener\">Google Business Profile<\/a> often appears before the website. This works in local searches and is one of the most visible tools a general contractor has.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"554\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-1-1024x554.png\" alt=\"\" class=\"wp-image-2737\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-1-1024x554.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-1-300x162.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-1-768x415.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-1-1536x831.png 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-1.png 1747w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">To optimize the profile, it\u2019s better to&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Have high-quality photos of the real office<\/li>\n\n\n\n<li>Keep contact info, hours, and service area updated<\/li>\n\n\n\n<li>Respond to client reviews (to negative ones, too)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The Google Business Profile is often a client\u2019s first impression. Keeping it updated and good-looking can be a deciding factor for calling or scrolling in search of more reliable profiles.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Build a Professional Website&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">When clicking the ads, the client will navigate to the general contractor\u2019s website, and it needs to do more than look good.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Clients visit general contractor websites not to browse casually but to look for answers. A professional website needs to list services and address the client\u2019s concerns.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For instance, contractors can include FAQs to address questions related to project deadlines, tools, and equipment they use.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"680\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/plasterco-1024x680.png\" alt=\"\" class=\"wp-image-2738\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/plasterco-1024x680.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/plasterco-300x199.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/plasterco-768x510.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/plasterco.png 1366w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Professional websites should have a clear call to action, like \u201cRequest a quote\u201d, which is short and visible. Make it easy for visitors to take the next step and hire you.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Invest in Converting Content&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Before the campaign starts, think about what content will be advertised. This does not mean a text on a page. Effective content includes case studies, behind-the-scenes photos, and anything else that shows how your business operates day to day.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"657\" height=\"856\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Contractor_Instagram.png\" alt=\"\" class=\"wp-image-2740\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Contractor_Instagram.png 657w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Contractor_Instagram-230x300.png 230w\" sizes=\"(max-width: 657px) 100vw, 657px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, it\u2019s important to invest efforts into some valuable content. For example,\u00a0 before-and-after shots, walkthroughs of completed projects, or even clips showing what <a href=\"https:\/\/buildern.com\/resources\/blog\/construction-management-software-for-small-businesses\/\" target=\"_blank\" rel=\"noreferrer noopener\">construction management software<\/a> you use to stay organized. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"728\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Project-Overview-1024x728.jpg\" alt=\"\" class=\"wp-image-2741\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Project-Overview-1024x728.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Project-Overview-300x213.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Project-Overview-768x546.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Project-Overview-1536x1092.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Project-Overview-2048x1456.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Great advertising isn\u2019t built in isolation. Relevant and transparent content about the company\u2019s workflow is more likely to turn clicks into clients. So don\u2019t treat content and advertising as separate efforts.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"channels\">Best Advertising Channels for Contractors&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Traditional advertising, like placing company banners on-site, running newspaper ads, or even a quick spot on local TV, used to bring in leads. This still works in some cases. For example, a well-placed banner showing the finished result of a nearby home can spark interest among potential customers.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, <a href=\"https:\/\/www.statista.com\/topics\/1164\/online-advertising\/#section-advertising\" target=\"_blank\" rel=\"noreferrer noopener\">social media advertising<\/a> has been growing steadily worldwide, and the construction industry is no exception. If done right, online campaigns provide precise targeting, real-time results, and better return on investment (ROI). Let\u2019s figure out how to launch ad campaigns on Google and social media.\u00a0<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">PPC Advertising for Contractors&nbsp;&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pay-per-click (PPC) is an advertising strategy where you pay only when someone clicks the ad. This means you are paying for real, measurable interest, not for impressions only.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This method allows advertisers to display their ads on search engines and social media. The advertiser can set ads to show only in specific areas, for instance, within 20 miles of your office, or in specific zip codes or cities.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>PPC for Search Engines<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Search ads on Google are one of the most effective PPC channels for contractors. For example, when people search for \u201ccustom home builder in Miami\u201d, someone\u2019s ad may appear at the top of Google search results.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"554\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-2-1024x554.png\" alt=\"\" class=\"wp-image-2742\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-2-1024x554.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-2-300x162.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-2-768x415.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-2-1536x831.png 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/GoogleBusiness-2.png 1747w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">To run these kinds of ads, advertisers typically use platforms like <a href=\"https:\/\/ads.google.com\/intl\/en\/home\/how-it-works\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Google Ads<\/strong><\/a>. Here you set your target keywords (<em>custom home builder in Miami<\/em>), define your service area, and write short text to drive clicks.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With Google Ads, it\u2019s possible to run campaigns on Google Search, YouTube, and other Google-owned platforms.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The best part is that there is no strict budget. The advertiser decides how much to spend every day or week, and not to be charged more than the limit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Search engines use an auction system. If several general contractors are targeting the same keywords, the highest bids show first. It\u2019s possible to start with a modest daily budget and adjust it based on the performance.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\ud83d\udca1Example:&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A contractor runs a $25\/day campaign targeting <em>\u201c<\/em>custom home builder in Austin<em>\u201d<\/em>. If the average cost-per-click (CPC) is $5, the advertiser can get around 5 qualified clicks per day. In a few days, based on the performance, one will see which keywords perform best and can change the budget.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>PPC for Social Media&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This type of advertising helps contractors reach clients on social media channels. Unlike search engine PPC, which focuses on users actively searching for services.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The main tool for Facebook and Instagram is <a href=\"https:\/\/business.meta.com\/?locale=en_US\" target=\"_blank\" rel=\"noreferrer noopener\">Meta Ads Manager<\/a>. It lets the contractors run highly visual campaigns using photos, videos, and Reels. Here general contractor can show success stories, for example, by sharing projects and behind-the-scenes photos.\u00a0\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Again, you can show the ads to homeowners in specific ZIP codes, with certain interests, or income levels. Besides, it\u2019s easy to track the results of your campaign.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/app.buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img decoding=\"async\" width=\"1024\" height=\"324\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-1024x324.png\" alt=\"Free builders software for construction project management\" class=\"wp-image-651\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-1024x324.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-300x95.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-768x243.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software.png 1504w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Social Media Advertising&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Platforms like Facebook and Instagram are ideal for showing a full custom home build or kitchen remodeling. On social media, general contractors can target clients long before they start searching for services.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Besides, it is possible to follow your competitor\u2019s actions on <a href=\"https:\/\/www.facebook.com\/ads\/library\/?active_status=active&amp;ad_type=political_and_issue_ads&amp;country=AM&amp;is_targeted_country=false&amp;media_type=all\" target=\"_blank\" rel=\"noreferrer noopener\">Ad Library<\/a> by searching for a keyword, an ad, or an advertiser.\u00a0\u00a0<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How to Boost Posts and Visuals on Facebook and Instagram&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Boosting posts on Facebook and Instagram is one of the easiest ways to get started with social media advertising. This doesn\u2019t require much technical knowledge.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Start by choosing a high-performing post. This is when you understand the advantage of high-quality content, like a visual showing the skills and expertise.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Then click the \u201cBoost Post\u201d button directly on your Facebook Page or Instagram app (linked to your Facebook Business Manager). Reels under 60 seconds work especially well for showing transformations, timelapses, or real client feedback.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Users can be targeted by age, location, and gender. Meanwhile, advanced targeting will focus on interests and behaviors. For example, a general contractor can target users aged 30-60 who live in Orange County, California, and are interested in home renovation and have been recently browsing home remodeling content.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"627\" height=\"732\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Boostingpost.png\" alt=\"\" class=\"wp-image-2743\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Boostingpost.png 627w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Boostingpost-257x300.png 257w\" sizes=\"(max-width: 627px) 100vw, 627px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Boosting vs. Campaigns&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Boosting<\/strong> is a simple and fast way. It takes a few clicks to set a budget, pick a target audience, and start running the promotion. Boosting is a great option when the goal is visibility, engagement, or brand awareness.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Running ad campaigns<\/strong> inside Meta Ads Manager offers more customization and targeting. This method of advertising for contractors is great if the goal is to collect leads or get people to message you directly. Here, it\u2019s not about choosing just one post. The advertiser can pick a text and a visual and generate an ad. Besides, the user can set different goals depending on the campaign.&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Lead Generation<\/strong>: Collect emails or phone numbers directly through a built-in form without leaving Facebook or Instagram.<\/li>\n\n\n\n<li><strong>Website Traffic<\/strong>: Send visitors to your website or a specific landing page.<\/li>\n\n\n\n<li><strong>Calls or Messages<\/strong>: Encourage people to call your business or send a message.\u00a0<\/li>\n\n\n\n<li><strong>Engagement<\/strong>: Increase likes, comments, and shares to build awareness. <\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"621\" height=\"840\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Campaigngoals.png\" alt=\"\" class=\"wp-image-2744\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Campaigngoals.png 621w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Campaigngoals-222x300.png 222w\" sizes=\"(max-width: 621px) 100vw, 621px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Social Media Platforms Beyond Meta<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">While Meta is the best for outreach, other channels have different advantages for general contractors depending on the target audience.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>LinkedIn<\/strong> is a more niche platform useful for B2B targeting. This works if a building firm wants to target commercial projects or vendor partnerships. Besides, ads here are more expensive than on Facebook and Instagram, with a minimum daily budget starting at $10.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>TikTok<\/strong>, on the other hand, is better for engaging a younger audience. It\u2019s a great platform for timelapses and before\/after storytelling content.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"ads\">Marketing Beyond Ads<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Advertising targets clients directly, but it\u2019s not always effective to run campaigns without taking a break. Long-term marketing strategies keep clients engaged and turn them into loyal clients.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Get Found Organically with SEO&nbsp;<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Many homeowners search on Google without clicking ads. A strong search engine optimization (SEO) strategy ensures that the company\u2019s website ranks for relevant and key terms as \u201ccustom remodel in Chicago.\u201d&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This means a general contractor needs clear website pages to show the services. Each solution or service, like \u201ccustom homes\u201d or \u201cfarmhouses,\u201d should have its dedicated page, a landing page. Use location-specific keywords such as \u201cLos Angeles home builder\u201d in the headings and throughout the content. This helps Google match your website to local searches.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"686\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/jfkwebsite-1-1024x686.png\" alt=\"\" class=\"wp-image-2745\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/jfkwebsite-1-1024x686.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/jfkwebsite-1-300x201.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/jfkwebsite-1-768x514.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/jfkwebsite-1.png 1345w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Besides, the technical features of the website are important. It ideally should load in under 3 seconds and be mobile-friendly.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Client Referrals and Reviews<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Word-of-mouth remains a powerful tool to win new projects in the construction industry. People willing to build a house are likely to trust recommendations from their friends or neighbors.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is the reason that building long-term relationships and collecting client reviews is a part of marketing strategy. Encourage satisfied clients to leave feedback on Google and Facebook as positive reviews improve visibility in local search results.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, it\u2019s better to start the communication strategy not after but during the project. Having transparent communication channels is an advantage and makes a lasting impression. Buildern, for example, enables a contractor and a homeowner to communicate and exchange real-time information without leaving the construction management software.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-1-1024x576.jpg\" alt=\"\" class=\"wp-image-2731\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-1-1024x576.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-1-300x169.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-1-768x432.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-1-1536x863.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/Messaging-1-2048x1151.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">When supported by excellent communication and project transparency, referrals and reviews work better.\u00a0\u00a0<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">What Is the Advertising for Contractors?&nbsp;&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">There is no universal solution. The advertising for contractors depends on goals and the target audience. PPC ads on Google are great to target homeowners searching for services.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Meanwhile, boosting posts and launching ad campaigns on social media platforms helps in promoting project visuals even before clients start searching.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Kind of Content Works Best for Contractor Ads?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The proof of good quality and expertise will bring in more leads. The most powerful content for general contractors is the on-site videos and photos of their ongoing and previous projects. The more real-time visuals you have, the better your campaign will work.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Can Contractors Use Their Ad Budget Effectively?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">General contractors can start from small amounts, like $5 per day, to test different formats and visuals. They have to check metrics and insights to improve or make shifts whenever needed. Regardless of the format and ad type, it\u2019s essential to have high-quality content to make people click the ads.<br><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/app.buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img decoding=\"async\" width=\"1024\" height=\"297\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software-1024x297.png\" alt=\"Free construction project management software online\" class=\"wp-image-742\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software-1024x297.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software-300x87.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software-768x223.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Construction-software.png 1504w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>How to advertise a building business without spending too much? General contractors work in a very competitive environment. Like any other business, they want to reach more customers.&nbsp; Having a flashy banner or digital ads is a good tactic. However, the number one concern is how to target the right homeowners. The goal is not [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":2746,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[2,27],"tags":[40],"class_list":["post-2734","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-construction-company-blog","tag-construction-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0<\/title>\n<meta name=\"description\" content=\"Find smart advertising tips for contractors on how to run effective PPC and social media ads without wasting your budget.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0\" \/>\n<meta property=\"og:description\" content=\"Find smart advertising tips for contractors on how to run effective PPC and social media ads without wasting your budget.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/\" \/>\n<meta property=\"og:site_name\" content=\"Buildern resources\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/buildernsoft\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-20T06:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-02T10:07:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2172\" \/>\n\t<meta property=\"og:image:height\" content=\"1416\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Meri Markaryan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Meri Markaryan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/\"},\"author\":{\"name\":\"Meri Markaryan\",\"@id\":\"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8\"},\"headline\":\"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0\",\"datePublished\":\"2025-07-20T06:00:00+00:00\",\"dateModified\":\"2025-09-02T10:07:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/\"},\"wordCount\":2349,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/buildern.com\/resources\/#organization\"},\"image\":{\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg\",\"keywords\":[\"Construction Management\"],\"articleSection\":[\"Construction Blog\",\"Construction Company\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/\",\"url\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/\",\"name\":\"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0\",\"isPartOf\":{\"@id\":\"https:\/\/buildern.com\/resources\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg\",\"datePublished\":\"2025-07-20T06:00:00+00:00\",\"dateModified\":\"2025-09-02T10:07:42+00:00\",\"description\":\"Find smart advertising tips for contractors on how to run effective PPC and social media ads without wasting your budget.\",\"breadcrumb\":{\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#primaryimage\",\"url\":\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg\",\"contentUrl\":\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg\",\"width\":2172,\"height\":1416,\"caption\":\"advertising for contractors\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/buildern.com\/resources\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/buildern.com\/resources\/#website\",\"url\":\"https:\/\/buildern.com\/resources\/\",\"name\":\"Buildern resources\",\"description\":\"Buildern resources\",\"publisher\":{\"@id\":\"https:\/\/buildern.com\/resources\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/buildern.com\/resources\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/buildern.com\/resources\/#organization\",\"name\":\"Buildern resources\",\"url\":\"https:\/\/buildern.com\/resources\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png\",\"contentUrl\":\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png\",\"width\":401,\"height\":137,\"caption\":\"Buildern resources\"},\"image\":{\"@id\":\"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/buildernsoft\",\"https:\/\/www.instagram.com\/buildern.soft\/\",\"https:\/\/www.linkedin.com\/company\/buildern\/\",\"https:\/\/www.youtube.com\/@buildern\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8\",\"name\":\"Meri Markaryan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/buildern.com\/resources\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"caption\":\"Meri Markaryan\"},\"url\":\"https:\/\/buildern.com\/resources\/author\/meri-markaryan\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0","description":"Find smart advertising tips for contractors on how to run effective PPC and social media ads without wasting your budget.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/","og_locale":"en_US","og_type":"article","og_title":"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0","og_description":"Find smart advertising tips for contractors on how to run effective PPC and social media ads without wasting your budget.","og_url":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/","og_site_name":"Buildern resources","article_publisher":"https:\/\/www.facebook.com\/buildernsoft","article_published_time":"2025-07-20T06:00:00+00:00","article_modified_time":"2025-09-02T10:07:42+00:00","og_image":[{"width":2172,"height":1416,"url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg","type":"image\/jpeg"}],"author":"Meri Markaryan","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Meri Markaryan","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#article","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/"},"author":{"name":"Meri Markaryan","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8"},"headline":"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0","datePublished":"2025-07-20T06:00:00+00:00","dateModified":"2025-09-02T10:07:42+00:00","mainEntityOfPage":{"@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/"},"wordCount":2349,"commentCount":0,"publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"image":{"@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg","keywords":["Construction Management"],"articleSection":["Construction Blog","Construction Company"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/","url":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/","name":"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/#website"},"primaryImageOfPage":{"@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#primaryimage"},"image":{"@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg","datePublished":"2025-07-20T06:00:00+00:00","dateModified":"2025-09-02T10:07:42+00:00","description":"Find smart advertising tips for contractors on how to run effective PPC and social media ads without wasting your budget.","breadcrumb":{"@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#primaryimage","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg","width":2172,"height":1416,"caption":"advertising for contractors"},{"@type":"BreadcrumbList","@id":"https:\/\/buildern.com\/resources\/blog\/advertising-for-contractors\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/buildern.com\/resources\/"},{"@type":"ListItem","position":2,"name":"Advertising for Contractors: A Short Guide to Ad Tools\u00a0\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/buildern.com\/resources\/#website","url":"https:\/\/buildern.com\/resources\/","name":"Buildern resources","description":"Buildern resources","publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/buildern.com\/resources\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/buildern.com\/resources\/#organization","name":"Buildern resources","url":"https:\/\/buildern.com\/resources\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","width":401,"height":137,"caption":"Buildern resources"},"image":{"@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/buildernsoft","https:\/\/www.instagram.com\/buildern.soft\/","https:\/\/www.linkedin.com\/company\/buildern\/","https:\/\/www.youtube.com\/@buildern"]},{"@type":"Person","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8","name":"Meri Markaryan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","caption":"Meri Markaryan"},"url":"https:\/\/buildern.com\/resources\/author\/meri-markaryan\/"}]}},"jetpack_featured_media_url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/07\/BLOG_COVER_Advertising-for-Contractors.jpg","jetpack_sharing_enabled":true,"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/2734","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/comments?post=2734"}],"version-history":[{"count":2,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/2734\/revisions"}],"predecessor-version":[{"id":2747,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/2734\/revisions\/2747"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media\/2746"}],"wp:attachment":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media?parent=2734"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/categories?post=2734"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/tags?post=2734"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}