{"id":2337,"date":"2025-05-06T05:20:36","date_gmt":"2025-05-06T12:20:36","guid":{"rendered":"https:\/\/buildern.com\/resources\/?p=2337"},"modified":"2026-11-03T00:31:17","modified_gmt":"2026-11-03T08:31:17","slug":"aligned-building","status":"publish","type":"post","link":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/","title":{"rendered":"Buildern in Action: How Aligned Building Streamlines Projects"},"content":{"rendered":"\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Company<\/strong> <strong>Name<\/strong>: Aligned Building<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Specialization<\/strong>: Sustainable high-performance homes<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Years<\/strong> <strong>of<\/strong> <strong>Operation<\/strong>: 12 years<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Location<\/strong>: Melbourne (Inner West)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The Key Challenge<\/strong>: Managing disconnected systems with no reliable cost tracking, resulting in duplicated work, poor visibility into project financials, and ongoing frustration with daily operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The Result<\/strong>: By switching to Buildern, Aligned Building consolidated its entire project management workflow into one platform. This brought clarity, accuracy, and speed to day-to-day operations, from budgeting and timesheets to task tracking, allowing the team to work more efficiently and confidently.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/www.alignedbuilding.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Aligned Building<\/a><\/strong> is a Melbourne-based residential construction company with over 12 years of experience in delivering sustainable, high-performance homes. With a focus on design integrity, environmental performance, and long-term livability, the company works closely with homeowners and architects to build homes that reflect both aesthetic vision and construction excellence. Operating primarily in Melbourne\u2019s inner west, Aligned Building is known for its attention to detail, clear communication, and commitment to building smarter, more energy-efficient homes.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"324\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Michael-Murphy.-2-1024x324.jpg\" alt=\"Michael Murphy\" class=\"wp-image-2344\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Michael-Murphy.-2-1024x324.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Michael-Murphy.-2-300x95.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Michael-Murphy.-2-768x243.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Michael-Murphy.-2-1536x486.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Michael-Murphy.-2.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge: A Fragmented Tech Stack That Slowed Everything Down<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before implementing Buildern, Aligned Building faced persistent inefficiencies caused by a fragmented tech stack. Multiple software platforms were in use, but they didn\u2019t integrate or meet the operational needs of the business. Cost tracking, which is a critical part of managing high-performance residential builds, was particularly lacking in accuracy and reliability.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><em>\u201cI had major issues with multiple software platforms not integrating or doing what I needed them to do. Aside from clunky problems, there was also a lack of accurate cost tracking capability, which is very important for us,\u201d says the company\u2019s director, Michael Murphy.<\/em><\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">As a result, project planning and visibility suffered. The team often had to repeat tasks, chase across different tools, and work without a clear understanding of running costs. The inefficiencies were constant and frustrating.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><em>\u201cWe had a lack of clarity, planning, organization, doubling up of work, lack of insight into running and project costs, and I was generally frustrated with all our software.\u201d<\/em><\/p>\n<\/blockquote>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"684\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/case-study-1024x684.jpg\" alt=\"case study\" class=\"wp-image-2347\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/case-study-1024x684.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/case-study-300x200.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/case-study-768x513.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/case-study-1536x1026.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/case-study-2048x1368.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">The Solution: Why Buildern Was the Clear Choice<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When searching for a better solution, Buildern stood out due to its usability and intentional feature set. Unlike the software <strong>Aligned Building<\/strong> had previously used, <a href=\"https:\/\/buildern.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Buildern<\/a> provided an all-in-one system that was both powerful and easy to navigate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>\u201cThe usability of the software quite simply blows everything else out of the water. Every feature is well thought out, usable, and functional without being difficult to learn.\u201d<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The rate of improvement and development within Buildern was also a key factor. The platform continues to evolve quickly based on <a href=\"https:\/\/buildern.com\/features\/upcoming-features\" target=\"_blank\" rel=\"noreferrer noopener\">user feedback<\/a>, something the team noticed early on. The rapid expansion and improvement of features is also impressive and faster than any software they have ever used.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"324\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-1024x324.png\" alt=\"Free builders software for construction project management\" class=\"wp-image-651\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-1024x324.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-300x95.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software-768x243.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2023\/01\/Free-Builder-Software.png 1504w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Getting Started: A Straightforward, Supported Onboarding<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Aligned Building<\/em> faced a lack of clarity, planning, and organization in its operations. Project data was scattered, tasks were often duplicated, and there was little visibility into running or projected costs. The team relied on multiple disconnected tools, which led to inefficiencies and ongoing frustration with day-to-day workflows.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>The transition to Buildern was straightforward<\/em>. Most of the setup was completed internally, and when support was required, <strong>Buildern\u2019s team responded quickly with practical guidance<\/strong>. The system proved easy to learn, allowing the team to get up and running without disruption.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Results: Complete Visibility and Better Project Control&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Buildern<\/em> helped address the issues Aligned Building had been facing by offering a centralized, responsive system. The team now has access to tools that function well together, with cost tracking and <a href=\"https:\/\/buildern.com\/features\/construction-project-management-software\" target=\"_blank\" rel=\"noreferrer noopener\">project management features<\/a> working as intended. <em>Buildern also actively takes in user feedback, which contributes to ongoing improvements that align with the needs of construction professionals<\/em>.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>&#8220;<strong>Assistance when needed, and listening to my feedback and ideas for improvements<\/strong>&#8220;, Michael Murphy.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Key Features Aligned Relies On:<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Buildern\u2019s <a href=\"https:\/\/buildern.com\/features\/estimation\" target=\"_blank\" rel=\"noreferrer noopener\">estimating<\/a> and <a href=\"https:\/\/buildern.com\/features\/construction-budgeting-software\" target=\"_blank\" rel=\"noreferrer noopener\">budgeting<\/a> tools delivered immediate value for Aligned Building. The integration of cost codes and timesheets created a clear, detailed view of project finances, making cost management and reporting far more precise and efficient. <em>The ability to customize these components added further flexibility to suit the company\u2019s workflow.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Beyond financial management, Buildern\u2019s day-to-day project tools, such as file handling, To-Do lists, and timesheets, offered a noticeable upgrade. The intuitive layout and smooth navigation significantly improved how the team handled ongoing project tasks compared to their previous software.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"708\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/buildern-1024x708.jpg\" alt=\"Buildern's estimating and budgeting tools\" class=\"wp-image-2348\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/buildern-1024x708.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/buildern-300x207.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/buildern-768x531.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/buildern-1536x1062.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/buildern.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Future Outlook: Building Smarter, Together<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Aligned Building now relies on Buildern as a central part of its day-to-day operations<\/em>. From tracking detailed estimates to logging timesheets and managing selection deadlines, the software supports the entire workflow of the team.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">\u201cIt has everyone being able to access the information they need easily, whether it\u2019s logging a timesheet, tracking that cost to a detailed estimate we have created, handling a selection deadline with a client, or even simply making a to-do list or meeting agenda.\u201d<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Buildern continues to play a role in making the team\u2019s work more efficient and more enjoyable.<\/em><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/building-1024x683.jpg\" alt=\"Aligned Building\" class=\"wp-image-2349\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/building-1024x683.jpg 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/building-300x200.jpg 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/building-768x512.jpg 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/building-1536x1025.jpg 1536w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/building-2048x1366.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/buildern.com\/signup\" target=\"_blank\" rel=\" noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"297\" src=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-1024x297.png\" alt=\"Free construction software online\" class=\"wp-image-752\" srcset=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-1024x297.png 1024w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-300x87.png 300w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software-768x223.png 768w, https:\/\/buildern.com\/resources\/wp-content\/uploads\/2022\/12\/Free-Construction-Software.png 1504w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Company Name: Aligned Building Specialization: Sustainable high-performance homes Years of Operation: 12 years Location: Melbourne (Inner West) The Key Challenge: Managing disconnected systems with no reliable cost tracking, resulting in duplicated work, poor visibility into project financials, and ongoing frustration with daily operations. The Result: By switching to Buildern, Aligned Building consolidated its entire project [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":2338,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[19,2],"tags":[],"class_list":["post-2337","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-study","category-blog"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Buildern in Action: How Aligned Building Streamlines Projects<\/title>\n<meta name=\"description\" content=\"How Aligned Building boosted efficiency by switching to Buildern\u2019s all-in-one construction project management software for residential builds.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Buildern in Action: How Aligned Building Streamlines Projects\" \/>\n<meta property=\"og:description\" content=\"How Aligned Building boosted efficiency by switching to Buildern\u2019s all-in-one construction project management software for residential builds.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/\" \/>\n<meta property=\"og:site_name\" content=\"Buildern resources\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/buildernsoft\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-06T12:20:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-03T08:31:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Aligned-Building.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1336\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Meri Markaryan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Meri Markaryan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/\"},\"author\":{\"name\":\"Meri Markaryan\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/person\\\/51b7b24ec569683e9d0308be4b5161a8\"},\"headline\":\"Buildern in Action: How Aligned Building Streamlines Projects\",\"datePublished\":\"2025-05-06T12:20:36+00:00\",\"dateModified\":\"2026-11-03T08:31:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/\"},\"wordCount\":832,\"publisher\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Aligned-Building.jpg\",\"articleSection\":[\"Case Studies\",\"Construction Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/\",\"name\":\"Buildern in Action: How Aligned Building Streamlines Projects\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Aligned-Building.jpg\",\"datePublished\":\"2025-05-06T12:20:36+00:00\",\"dateModified\":\"2026-11-03T08:31:17+00:00\",\"description\":\"How Aligned Building boosted efficiency by switching to Buildern\u2019s all-in-one construction project management software for residential builds.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/#primaryimage\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Aligned-Building.jpg\",\"contentUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Aligned-Building.jpg\",\"width\":2048,\"height\":1336,\"caption\":\"Aligned Building\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/case-study\\\/aligned-building\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Buildern in Action: How Aligned Building Streamlines Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#website\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\",\"name\":\"Buildern resources\",\"description\":\"Buildern resources\",\"publisher\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/buildern.com\\\/resources\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#organization\",\"name\":\"Buildern resources\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Buildern-logo..png\",\"contentUrl\":\"https:\\\/\\\/buildern.com\\\/resources\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Buildern-logo..png\",\"width\":401,\"height\":137,\"caption\":\"Buildern resources\"},\"image\":{\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/buildernsoft\",\"https:\\\/\\\/www.instagram.com\\\/buildern.soft\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/buildern\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@buildern\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/buildern.com\\\/resources\\\/#\\\/schema\\\/person\\\/51b7b24ec569683e9d0308be4b5161a8\",\"name\":\"Meri Markaryan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g\",\"caption\":\"Meri Markaryan\"},\"url\":\"https:\\\/\\\/buildern.com\\\/resources\\\/author\\\/meri-markaryan\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Buildern in Action: How Aligned Building Streamlines Projects","description":"How Aligned Building boosted efficiency by switching to Buildern\u2019s all-in-one construction project management software for residential builds.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/","og_locale":"en_US","og_type":"article","og_title":"Buildern in Action: How Aligned Building Streamlines Projects","og_description":"How Aligned Building boosted efficiency by switching to Buildern\u2019s all-in-one construction project management software for residential builds.","og_url":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/","og_site_name":"Buildern resources","article_publisher":"https:\/\/www.facebook.com\/buildernsoft","article_published_time":"2025-05-06T12:20:36+00:00","article_modified_time":"2026-11-03T08:31:17+00:00","og_image":[{"width":2048,"height":1336,"url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Aligned-Building.jpg","type":"image\/jpeg"}],"author":"Meri Markaryan","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Meri Markaryan","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/#article","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/"},"author":{"name":"Meri Markaryan","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8"},"headline":"Buildern in Action: How Aligned Building Streamlines Projects","datePublished":"2025-05-06T12:20:36+00:00","dateModified":"2026-11-03T08:31:17+00:00","mainEntityOfPage":{"@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/"},"wordCount":832,"publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"image":{"@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Aligned-Building.jpg","articleSection":["Case Studies","Construction Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/","url":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/","name":"Buildern in Action: How Aligned Building Streamlines Projects","isPartOf":{"@id":"https:\/\/buildern.com\/resources\/#website"},"primaryImageOfPage":{"@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/#primaryimage"},"image":{"@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/#primaryimage"},"thumbnailUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Aligned-Building.jpg","datePublished":"2025-05-06T12:20:36+00:00","dateModified":"2026-11-03T08:31:17+00:00","description":"How Aligned Building boosted efficiency by switching to Buildern\u2019s all-in-one construction project management software for residential builds.","breadcrumb":{"@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/buildern.com\/resources\/case-study\/aligned-building\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/#primaryimage","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Aligned-Building.jpg","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Aligned-Building.jpg","width":2048,"height":1336,"caption":"Aligned Building"},{"@type":"BreadcrumbList","@id":"https:\/\/buildern.com\/resources\/case-study\/aligned-building\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/buildern.com\/resources\/"},{"@type":"ListItem","position":2,"name":"Buildern in Action: How Aligned Building Streamlines Projects"}]},{"@type":"WebSite","@id":"https:\/\/buildern.com\/resources\/#website","url":"https:\/\/buildern.com\/resources\/","name":"Buildern resources","description":"Buildern resources","publisher":{"@id":"https:\/\/buildern.com\/resources\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/buildern.com\/resources\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/buildern.com\/resources\/#organization","name":"Buildern resources","url":"https:\/\/buildern.com\/resources\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/","url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","contentUrl":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2021\/12\/Buildern-logo..png","width":401,"height":137,"caption":"Buildern resources"},"image":{"@id":"https:\/\/buildern.com\/resources\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/buildernsoft","https:\/\/www.instagram.com\/buildern.soft\/","https:\/\/www.linkedin.com\/company\/buildern\/","https:\/\/www.youtube.com\/@buildern"]},{"@type":"Person","@id":"https:\/\/buildern.com\/resources\/#\/schema\/person\/51b7b24ec569683e9d0308be4b5161a8","name":"Meri Markaryan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7177042331b88685f15f1d275f2c4ae7939384dcf40ae694e264ce48fb7fc087?s=96&d=mm&r=g","caption":"Meri Markaryan"},"url":"https:\/\/buildern.com\/resources\/author\/meri-markaryan\/"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/buildern.com\/resources\/wp-content\/uploads\/2025\/05\/Aligned-Building.jpg","post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/2337","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/comments?post=2337"}],"version-history":[{"count":22,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/2337\/revisions"}],"predecessor-version":[{"id":6584,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/posts\/2337\/revisions\/6584"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media\/2338"}],"wp:attachment":[{"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/media?parent=2337"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/categories?post=2337"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buildern.com\/resources\/wp-json\/wp\/v2\/tags?post=2337"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}